Laserfiche WebLink
Mr. Brock Bowles <br />June 9, 2015 <br />Page 2 <br />Response: The text on pg. 4 of Section 2.05.3(3) has been revised to reference Map <br />2.05.3(3)-4. <br />7) The Division has a new series of comments regarding Map 2.05.3(3)-4, to which a <br />number of additional changes have been made. Please update the map to address the <br />following comments: <br />a) The base map in the plan view has been updated with what appears to be current <br />topographic data (as opposed to pre -mining topography). This change is <br />extremely helpful. Please identify the various features, i.e. topsoil stockpile, coal <br />handling area (or other name, for the area north of the haul road), and <br />overburden stockpile. <br />Response: Various surface features have been identified on the map plan view. <br />8) In the legend, the first ditch symbol should be named "Ditch NHN-001 East" to be <br />consistent with nomenclature used elsewhere in the permit. <br />Response: The ditch symbol in the legend has been changed to "Ditch NHN-001 <br />East". <br />9) For the Haul Road Ditch Centerline, the word "South" should be inserted after <br />"Road" to be consistent with what appears on Map 2.05.3(4)-1. <br />Response: For the ditch centerline, the map legend has been changed to indicate <br />"Haul Road South Ditch Centerline". <br />10) Rather than naming the contours "Existing", please provide the date on which the <br />data (aerial photogrammetryl) was collected. <br />Response: The label "Existing Contours" has been removed from the legend and the <br />date on which the contour data was collected has been included in the title block. <br />Included in this adequacy response package are revised materials in response to your <br />adequacy comments, and a change sheet index to assist with incorporating the revised materials <br />into the permit document. <br />AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER <br />A Touchstone Energy' Cooperative , ; <br />