My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-09_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2015-06-09_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:01:37 PM
Creation date
6/9/2015 12:23:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
6/9/2015
Doc Name
2nd Round Adequacy Review Responses
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
TR8
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR! -STATE GENERATION AND TRANSMISSION ASSOCIATION, INC. <br />Baa,. <br />HEADQUARTERS: P.O. BOX 33695 DENVER, COLORADO 80233-0695 303-452-6911 <br />June 9, 2015 <br />Mr. Brock Bowles <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: New Horizon North Mine <br />Permit No. C-2010-089 <br />Technical Revision 08 (TR -08) <br />Second Round Adequacy Review Responses <br />Dear Mr. Bowles: <br />RECEIVED <br />JUN 0 9 2015 <br />D�VISMining & Safety��on, <br />Tri-State Generation and Transmission Association, Inc. (Tri-State) has received your adequacy <br />review letter for TR -08, dated April 8, 2015 and provides the following responses on behalf of Western <br />Fuels -Colorado, A Limited Liability Company (WFC) New Horizon North Mine. <br />1) Response: Item has been resolved. <br />2) Tri-State responded that the table on Map 2.05.3(3)-3 represents the proposed maximum <br />design, but the maximum design width was not necessary. If Tri-State has determined that a <br />minimum width of 40 feet will not be required for all haul roads, please revise the table on <br />Map 2.05.3(3) to reflect the actual minimum width necessary to accommodate traffic at the <br />site. <br />Response: The table on Map 2.05.3(3) has been revised to indicate the minimum width <br />necessary to accommodate traffic at the site is 30 feet. <br />3) Response: Item has been resolved. <br />4) Response: Item has been resolved. <br />5) Response: Item has been resolved. <br />6) The TOC was updated, as requested. The text on pg. 4 of Section 2.05.3(3) was revised to <br />direct the reader to Appendix 2.05.3(3)-3. Please also include a reference here to Map <br />2.05.3(3)-4. <br />AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYFR CRAIG STATION ESCALANTE STATION NUCLA STATION <br />P.O. BOX 1307 P.O. BOX 577 P.O. BOX 698 <br />CRAIG, CO 81626-1307 PREWITT, NM 87045 NUCLA, CO 81424-0698 <br />A Touchstone Energy`Cooperative <br />�„ __ 970-824-4411 505-972-5200 970-864-7316 <br />
The URL can be used to link to this page
Your browser does not support the video tag.