My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-04_REVISION - M1977376 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977376
>
2015-06-04_REVISION - M1977376 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:09 PM
Creation date
6/5/2015 4:17:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977376
IBM Index Class Name
REVISION
Doc Date
6/4/2015
Doc Name
Request TR02
From
Tuttle & Assoc.
To
DRMS
Type & Sequence
TR2
Email Name
TC1
WHE
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Drainage Report, May 29, 2015 <br />Canyon Dolomite Old Quarry Project <br />The Proposed Project will not affect existing offsite drainage flow patterns, and vice versa. <br />III. DRAINAGE DESIGN CRITERIA <br />A. Regulations and Criteria <br />The Division of Reclamation, Mining, and Safety (DRMS) does not have defined drainage <br />design criteria. This drainage report has been prepared in accordance with good <br />engineering practices and the references provided. <br />B. Selection of BMPs <br />The major Best Management Practice (BMP) under consideration for this Project is a rock <br />chute. <br />C. Hydrological Criteria <br />The rainfall data presented in the NOAA Atlas 14, Volume 8, Version 2 was used. The <br />Rational Method was used to calculate runoff. The Site was evaluated for the 10 -year and <br />100 year rainfall events. Site soils are Hydrologic Group D based on soil survey data and <br />site observations. <br />D. Hydraulic Criteria <br />The rock chute was designed using the methods presented in a series of papers by KM. <br />Robinson and others. See the References section. The channel leading to the rock chute <br />was designed using the Manning Equation. See attached calculations. <br />IV. DRAINAGE DESIGN <br />A. Design Elements <br />The site design consists of the rock chute and its approach channel. <br />B. Offsite Runoff Considerations <br />The Project is designed to safely pass the offsite runoff from the upstream basin. The <br />Canyon Dolomite -Drainage Report May2015-mv0 doc Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.