My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-04_REVISION - M1977376 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977376
>
2015-06-04_REVISION - M1977376 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:09 PM
Creation date
6/5/2015 4:17:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977376
IBM Index Class Name
REVISION
Doc Date
6/4/2015
Doc Name
Request TR02
From
Tuttle & Assoc.
To
DRMS
Type & Sequence
TR2
Email Name
TC1
WHE
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Drainage Report, May 29, 2015 <br />Canyon Dolomite Old Quarry Project <br />i. GENERAL LOCATION AND DESCRIPTION <br />EME Solutions, Inc. (EME) has been retained by Transit Mix Concrete Company (Client) <br />to provide this Final Drainage Report for the Canyon Dolomite Old Quarry Project. <br />A. Location <br />The Project Site (or Site) is located at the Canyon Dolomite Quarry Site located <br />approximately 1 mile west of Canon City, Colorado. The latitude and longitude of the site <br />are 38.453954°, -105.267026°. <br />B. Description of Property and Proposed Development <br />The Old Quarry portion of the Canyon Dolomite Quarry site will be used for fines <br />disposal. The purpose of this report is to provide the calculations and design for a channel <br />and rock chute that can safely pass the 100 -year storm flows across this fines disposal <br />area. <br />C. Other Drainage Studies <br />No other drainage studies were provided or discovered. <br />II. DRAINAGE BASINS AND SUB -BASINS <br />A. Basin Description <br />The drainage basin area that contributes flows to the Site is 33.7 acres. Flows from the <br />Site go to Sand Creek, located about 1 mile east of the Site. The terrain within the basin is <br />relatively steep. There is no baseflow. Although the soil hydrologic type is D, the runoff <br />does not appear to be substantial or rapid. At a site visit during a rainstorm on May 19, <br />2015 (and after several days of rain), the runoff across the site was estimated at less than <br />50 gallons per minute. <br />B. Sub -Basin Description <br />Because the Project is located at the mouth of a small canyon, the hydrology was <br />evaluated as a single basin. <br />Canyon DolomRe-Drainage Report -I &y2015-rev0 doc Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.