Laserfiche WebLink
2.05.3(3)-8A, Montrose Co. has requested that a 24" CMP be installed at stations 0+75 and <br />6+21. The SEDCAD calculations for these culverts are provided in Attachment 2.05.3(3)-27. <br />There will not be any special requirements which will be a part of the restoration of the <br />Sunshine Ranch Corner. This intersection will be restored in the same fashion as the <br />adjacent county roads and will be restored to county standards. The only thing special about <br />the restoration of this intersection is that there will be a stop sign in the direction opposing <br />2700 Road (BB Road), which will allow 2700 Road to be the main through road. There are no <br />special County requirements for the restoration of this intersection. <br />TABLE 2.05.3(3)-3 TIMING OF ROAD, DITCH, AND UTILITY DETOURS AND <br />RESTORATIONS. <br />Item <br />Description <br />Date <br />1 <br />Construct BB Road Detour <br />2000 <br />2 <br />Installed 26" & 12" pipeline to divert West Lateral Ditch around the <br />2002 <br />active mine area east of 27 Rd <br />3 <br />Installed a portion of the 26" HDPE pipe into its permanent location in <br />2003 <br />Section 1-( west of 27 Rd to end of pipeline- Morgan field) <br />4 <br />Construct BB 27 Detour Rd to Morgan, Enstrom, Johnson, Wilcox <br />2003 <br />5 <br />Extended the temporary 12" HDPE pipeline further into Section 36 to <br />2006 <br />service James Johnson <br />Abandon the temporary 12" HDPE pipeline to Johnson property. No <br />2007 <br />longer needed since WFC exercised its lease agreement. <br />Bury the 26 " & 12" HDPE pipeline into its permanent location in Section <br />2007 <br />31 and connect it to the already permant 26" pipe in Section 1 to <br />completely finish the entire pipeline project. <br />6 <br />Finish building 27 & BB East Rd to final graveled grade. The road was <br />2008 <br />opened for Public use and BB Detour Rd was closed. Pavement still <br />needs to be completed for project is finalized. <br />7 <br />Pave 27 Road and BB Road in original locations and restore Sunshine <br />2010 <br />Ranch Corner intersection. <br />9 <br />Remove BB Road detour and reclaim road area <br />2009 <br />10 <br />Mine west to last cut at western permit boundary <br />2013 <br />Revised February 2015 (TR -67) 2.05.3(3)-40 <br />