Laserfiche WebLink
Page 2 of 151 <br />063 <br />064 <br />065 <br />066 <br />067 <br />068 <br />075 <br />076 <br />077 <br />078 <br />079 <br />080 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />087 <br />088 <br />089 <br />090 <br />095 <br />100 <br />105 <br />106 <br />110 <br />111 <br />112 <br />113 <br />120 <br />121 <br />Replace Topsoil from Stockpile to East Haul Road <br />TRUCKI <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />l <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4.73 <br />$10,106.00 <br />$4,038.00 <br />$7,099.00 <br />$9,625.00 <br />$6,280.00 <br />$12,771.00 <br />$15,793.00 <br />$7,499.00 <br />$6,204.00 <br />$1,742.00 <br />$2,971.00 <br />$1,738.00 <br />$1,576.00 <br />$936.00 <br />$1,622.00 <br />$1,733.00 <br />$1,144.00 <br />$531.00 <br />$1,217.00 <br />$5,597.00 <br />$35,076.00 <br />$71,439.84 <br />$65,580.83 <br />$9,218.88 <br />$31,958.00 <br />$56,000.00 <br />$25,619.00 <br />$2,782.00 <br />$31,482.00 <br />$3,608.00 <br />$2,704.45 <br />$4,035.49 <br />Replace Topsoil from Stockpile to Northwest Haul <br />Road <br />TRUCKI <br />1.89 <br />Replace Topsoil from Stockpile to Equipment <br />Corridor Road <br />TRUCKI <br />3.32 <br />Replace Topsoil from Stockpile to Pond NHN-001 <br />and Ditches <br />TRUCKI <br />5.31 <br />Replace Topsoil from Stockpile to Pond NHN-002 <br />and Ditches <br />TRUCKI <br />2.94 <br />Replace Topsoil from Stockpile to Pond NEN-003 <br />and Ditches <br />TRUCKI <br />5.97 <br />Reseed Pit Areas with Dryland Mix #8 <br />REVEGE <br />75.26 <br />Reseed Pit Areas with Irrigated Mix #5 <br />REVEGE <br />36.40 <br />Reseed Pit Areas with Intensively Irrigated Pasture <br />Mix #7 <br />REVEGE <br />18.80 <br />Reseed Facilities Area with Dryland Mix #8 <br />REVEGE <br />8.30 <br />Reseed Overburden Stockpile Area with Dryland <br />Mix #8 <br />REVEGE <br />14.16 <br />Reseed Topsoil Stockpile Area with Dryland Mix <br />#8 <br />REVEGE <br />8.28 <br />Reseed Pond NHN-001 and Ditches with Dryland <br />Mix #8 <br />REVEGE <br />7.51 <br />Reseed Pond NHN-002 and Ditches with Dryland <br />Mix #8 <br />REVEGE <br />4.46 <br />Reseed Pond NHN-003 and Ditches with Dryland <br />Mix #8 <br />REVEGE <br />7.73 <br />Reseed East Haul Road with Dryland Mix #8 <br />REVEGE <br />8.26 <br />Reseed West Haul Road with Dryland Mix #8 <br />REVEGE <br />5.45 <br />Reseed Northwest Haul Road with Dryland Mix #8 <br />REVEGE <br />2.53 <br />Reseed Equipment Corridor Road with Dryland <br />Mix #8 <br />REVEGE <br />5.80 <br />Drill Seed Cover Crop on IP and IMP Reclamation <br />Areas <br />REVEGE <br />55.20 <br />Weed Spraying Over 10 -Year Liability Period <br />REVEGE <br />202.94 <br />Irrigate Garvey Properry <br />NA <br />0.00 <br />Demolish and Remove All Structures <br />DEMOLISH <br />480.00 <br />Plug and Seal All Monitoring Wells <br />BOREHOLE <br />36.00 <br />Clean Sediment Ponds <br />TRUCKI <br />95.40 <br />Site Maintenance Over Ten Year Liability Period <br />SITEMAINT <br />ENANCE <br />200.00 <br />Mobilize/Demobilize Equipment for Initial <br />Reclamation <br />MOBILIZE <br />11.77 <br />Mobilize/Demobilize Equipment for Pond <br />Cleaning <br />MOBILIZE <br />8.22 <br />Mobilize/Demobilize Equipment for Site <br />Maintenance <br />MOBILIZE <br />8.22 <br />Mobilize/Demobilize Equipment for Pond <br />Removal <br />MOBILIZE <br />8.22 <br />Seal NHN Water Well <br />BOREHOLE <br />8.00 <br />Seal Highwall Dewatering Wells DW12-1, DW12- <br />2, and DW 12-3 <br />BOREHOLE <br />12.00 <br />SUBTOTALS: <br />4179.67 <br />$4,156,574 <br />INDIRECT COSTS <br />CIRCES Cost Estimating Software <br />