Laserfiche WebLink
Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.868 <br />Blade type: <br />1.000 <br />Net correction: 0.3890 <br />Adjusted unit production: 1,116.55 LCY/hr <br />Adjusted fleet production: 2233.1 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.466/LCY <br />Total job time: 5.74 Hours <br />Total job cost: $5,976 <br />(GEN.) <br />(AVG.) <br />I SHIFT/DA <br />(FND-RF) <br />(CAT <br />(CAT <br />,AT H] <br />(PAT) <br />Page 15 of 151 <br />C[RCES Cost Estimating Software <br />