Laserfiche WebLink
Page 14 of 151 <br />BULLDOZER WORK <br />Task description: Regrade Overburden Stockpile Area <br />Permit Action: 2014 Midterm Review <br />Site: New Horizon North Mine (MT -1) Permit/Job#: C2010089 <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado <br />Date: 12/12/2014 County: Montrose <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D11R - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C089-005 <br />Total unit Cost/Hour: $520.29 <br />Total Fleet Cost/Hour: $1,040.57 <br />MATERIAL QUANTITIES <br />Initial Volume: 11,400 <br />Swell factor: 1.125 <br />Loose volume: 12,825 LCY <br />Source of estimated volume: Map 2.05.3(3)-3 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,000 feet <br />2,6501bs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$173.50 <br />NA <br />Operating Cost/Hour: <br />$308.78 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $520.29 <br />Total Fleet Cost/Hour: $1,040.57 <br />MATERIAL QUANTITIES <br />Initial Volume: 11,400 <br />Swell factor: 1.125 <br />Loose volume: 12,825 LCY <br />Source of estimated volume: Map 2.05.3(3)-3 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,000 feet <br />2,6501bs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />CIRCES Cost Estimating Software <br />