My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-16_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2015-03-16_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:24 PM
Creation date
6/3/2015 11:55:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
3/16/2015
Doc Name
Revegetation
Section_Exhibit Name
Section 2.05.4(2)(e) Revegetation
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to provide to keep the crop growing. Take soil samples after last cutting of alfalfa in preparation <br />for the following year, or in the spring prior to fertilizing and planting. <br />Year 3 -4 - Fertilize and irrigate the land, and harvest according to normal management <br />procedures. Maintain irrigation through until harvest each season. Take soil samples after last <br />cutting of alfalfa in preparation for the following year, or in the spring prior to fertilizing and <br />planting. <br />Year 5 - In the Fall, till the alfalfa crop and let it sit over the winter. <br />Year 6 - Prepare the seedbed for planting, fertilize, and plant the Rotation Crop. Provide <br />irrigation water to establish the crop, and continue irrigation through the end of harvest to <br />provide to keep the crop growing. Take soil samples after harvest in preparation for the <br />following year, or in the spring prior to fertilizing and planting. <br />Year 7 - In the Spring- Summer, fertilize per lab recommendations. Seed Mix #7 (including the <br />cover crop) will be planted. Provide irrigation water to establish the crop, and continue irrigation <br />through the end of harvest to keep the crop growing. Take soil samples after last cutting of <br />alfalfa in preparation for the following year, or in the spring prior to fertilizing and planting. <br />Year 8 -10 - Fertilize and irrigate the land; harvest according to normal management <br />procedures. Take soil samples after last cutting of alfalfa in preparation for the following year, <br />or in the spring prior to fertilizing and planting. <br />Compare production against the Irrigated Cropland reference area for bond release during <br />Years 8, 9 and 10 as appropriate. <br />In Years 4 and 5 the mine may use soil amendments in the IC areas to improve the quality of <br />the soil in the reclaim area. These amendments will be determined based on analysis of the <br />reclaim area soil versus the undisturbed reference area soil. For example, manure may be <br />applied if it is determined that the reclaim area soil has not recovered enough organic matter <br />since its placement. Organic matter is often lost when soil is stockpiled, as has happened with <br />all of the soil on the Morgan Property. Soil leaching may be done during non - alfalfa growing <br />years only. Soil amendments and /or leaching will also be applied to the IC reference area if <br />August 2013 PR -08 2.05.4(2)(e) - 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.