My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-16_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2015-03-16_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:24 PM
Creation date
6/3/2015 11:55:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
3/16/2015
Doc Name
Revegetation
Section_Exhibit Name
Section 2.05.4(2)(e) Revegetation
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.3.6 Seeding and Management Schedule <br />The following narrative and describes the sequence of steps for the revegetation process of <br />Irrigated Cropland. This schedule applies to all IC areas, both prime and non - prime. <br />Table 2.06.4(2)(e) -4 Seeding and Management Schedule <br />Year <br />Seed Mix <br />Seeding Time <br />Interim Vegetation <br />Monitoring <br />Bond Release <br />Vegetation Study <br />1 <br />Rotation Crop <br />Mix <br />Spring- Summer <br />2 <br />Seed Mix #7 <br />Spring- Summer <br />3 <br />No seeding <br />All IC <br />4 <br />No seeding <br />5 <br />No seeding <br />6 <br />Rotation Mix <br />Spring- Summer <br />7 <br />Seed Mix #7 <br />Spring- Summer <br />8 <br />No seeding <br />All IC <br />Prime Farmland only <br />9 <br />No seeding <br />All IC <br />10 <br />No seeding <br />All IC <br />Note: Seed Mix #7 includes a companion crop of oats. This oat crop is planted with the alfalfa in <br />that growing season. <br />Fertility testing of the soil will be conducted every year. Fertilization will be based on this testing <br />each year. <br />Year 1 - In Spring- Summer, place topsoil and conduct topsoil preparation and seedbed <br />preparation. Fertilize per lab recommendations. Rotation crop will be seeded following <br />preparation. Provide irrigation water to establish the crop, and continue irrigation through the <br />end of harvest to provide to keep the crop growing. Take soil samples after harvest in <br />preparation for the following year, or in the spring prior to fertilizing and planting. <br />Year 2 - In the Spring- Summer, fertilize per lab recommendations. Seed Mix #7 will be planted. <br />Provide irrigation water to establish the crop, and continue irrigation through the end of harvest <br />August 2013 PR -08 2.05.4(2)(e) - 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.