My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-16_PERMIT FILE - C1981008A (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2015-03-16_PERMIT FILE - C1981008A (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:24 PM
Creation date
6/3/2015 10:57:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
3/16/2015
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3) Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Map 2.05.3(3)-8 for details on the typical cross section of BB Road West of 2700 Road, as it <br />will be the same as the haul road. The width of the road in this section will be 27' wide when <br />restoration is completed. A compacted fill surface similar to the pre-existing condition will be <br />restored. <br />There will not be any special requirements which will be a part of the restoration of the <br />Sunshine Ranch Corner. This intersection will be restored in the same fashion as the <br />adjacent county roads and will be restored to county standards. The only thing special about <br />the restoration of this intersection is that there will be a stop sign in the direction opposing <br />2700 Road (BB Road), which will allow 2700 Road to be the main through road. There are no <br />special County requirements for the restoration of this intersection. <br />TABLE 2.05.3(3)-3 TIMING OF ROAD, DITCH, AND UTILITY DETOURS AND <br />RESTORATIONS. <br />Item <br />Description <br />Date <br />1 <br />Construct BB Road Detour <br />2000 <br />2 <br />Installed 26" & 12" pipeline to divert West Lateral Ditch around the <br />2002 <br />active mine area east of 27 Rd <br />3 <br />Installed a portion of the 26" HDPE pipe into its permanent location in <br />2003 <br />Section 1-( west of 27 Rd to end of pipeline- Morgan field) <br />Construct BB 27 Detour Rd to Morgan, Enstrom, Johnson, Wilcox <br />2003 <br />5 <br />Extended the temporary 12" HDPE pipeline further into Section 36 to <br />2006 <br />service James Johnson <br />6 <br />Abandon the temporary 12" HDPE pipeline to Johnson property. No <br />2007 <br />longer needed since WFC exercised its lease agreement. <br />7 <br />Bury the 26 " & 12" HDPE pipeline into its permanent location in Section <br />2007 <br />31 and connect it to the already permant 26" pipe in Section 1 to <br />completely finish the entire pipeline project. <br />8 <br />Finish building 27 & BB East Rd to final graveled grade. The road was <br />2008 <br />opened for Public use and BB Detour Rd was closed. Pavement still <br />needs to be completed for project is finalized. <br />9 <br />Remove BB Road detour and reclaim road area <br />12009 <br />(Revised December 2014 TR -65) 2.05.3(3)-40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.