My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-01_REVISION - C1996083 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2015-06-01_REVISION - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:01:16 PM
Creation date
6/1/2015 12:43:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
6/1/2015
Doc Name
2nd Adequacy Review No. 2
From
Bowie Resources, LLC
To
DRMS
Type & Sequence
TR98
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name of Addressee <br />Page 2 <br />Date <br />BRL Response: Please see revised appendix A. <br />Division Response: Proposed Appendix A was revised to reflect the total amount of topsoil to be <br />salvaged to reflect the topsoil salvaged from the borrow areas. <br />This item has been adequately addressed. <br />3. Division Initial Comment (3/11/2015): Proposed Volume IX, Gob Pile #2, Appendix A includes a <br />line item of, "Topsoil Salvage in Borrow Areas." Based on the proposed text, the Division <br />understands that the topsoil salvaged from the proposed borrow areas will be incorporated into <br />Topsoil Stockpile E. If this remains the case, please revise Appendix A to add a statement that <br />the topsoil salvage in borrow areas will be stockpiled at Pile E. <br />BRL Response: Please see revised Appendix A. In addition, Appendix A was updated to reflect <br />the in-place coverfill on the west half of gob pile #2 (aka gob pile #4). <br />Division Response: Proposed Appendix A was revised to include a statement that the topsoil <br />salvaged in borrow areas will be stockpiled at Pile E. <br />This item has been adequately addressed. <br />4. Division Initial Comment (3/11/2015): Based on the approval of Minor Revision No. 177 <br />associated with, C-1996-083, the disturbance area boundary has been revised to reflect the <br />current on -the -ground conditions. The proposed Map 18 does not reflect the current disturbance <br />area boundary as approved under MR -177. Please revise the proposed Map 18 to reflect the <br />proposed disturbance boundary to include what is approved. <br />BRL Response: Please see revised Map -18. <br />Division Response: Proposed Map 18 was revised to reflect the current permit boundary. <br />This item has been adequately addressed. <br />Division Initial Comment (3/11/2015): Proposed Map 22-D provides cross sections for the <br />Embankment Spillway of Pond C and the Emergency Spillway for Pond C. No spillway cross <br />sections were included as a part of the proposed Map 22-D Pond D designs. Please submit design <br />cross sections of the Pond D spillways or revise Map 22-D to include the information of the Pond <br />D Spillways. <br />BRL Response: Please see revised Map 22-D showing the revised sections for Pond D. <br />
The URL can be used to link to this page
Your browser does not support the video tag.