My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-01_REVISION - C1996083 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2015-06-01_REVISION - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:01:16 PM
Creation date
6/1/2015 12:43:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
6/1/2015
Doc Name
2nd Adequacy Review No. 2
From
Bowie Resources, LLC
To
DRMS
Type & Sequence
TR98
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />June 1, 2015 <br />Bill Bear <br />Bowie Resources, LLC. <br />P.O. Box 1488 <br />Paonia, CO 81428 <br />RE: Bowie No. 2 Mine, Permit No. C-1996-083 <br />Technical Revision No. 98 (TR -98) <br />Preliminary Adequacy Response Review <br />Dear Mr. Bear, <br />The Division received Bowie Resources, LLC's (BRL's) application for a technical revision (TR -98) on <br />January 30, 2015. The application was determined to be complete on February 9, 2015. One comment <br />letter has been received from the Colorado State Historic Preservation Officer stating that a finding of no <br />historic properties affected is appropriate for the proposed action. The Colorado Division of Reclamation, <br />Mining, and Safety completed its preliminary adequacy review of the proposed technical revision in a <br />letter dated March 11, 2015. BRL responded to the Division's Preliminary Adequacy Review with <br />information received on April 30, 2015. <br />1. Division Initial Comment (3/11/2015): Approved page 4A in Volume IX provides a map titled <br />Gob Pile Revisions with each portion of Gob Pile #2 delineated with the revision number. This <br />page was not included in the proposed revised text associated with TR -98. Please revise page 4A <br />of Exhibit IX to include the areas associated with TR -98. <br />BRL Response: Please see revised Page 4A. <br />Division Response: Proposed page 4A was revised to include the areas associated with TR -98. <br />This item has been adequately addressed. <br />2. Division Initial Comment (3/11/2015): Proposed Volume IX, Gob Pile #2, Appendix A, identifies <br />74,346 cy of salvaged topsoil. This number does not include the 2,339 cy of topsoil proposed to <br />be salvaged from the proposed Borrow Areas 1, 2, and 3. Please revise the total amount of <br />topsoil to be salvaged to reflect the topsoil salvaged from the proposed borrow areas. <br />OF CQlp <br />tL' i <br />I � <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor I Mike King, Executive Director I Virginia Brannon, Director 187G <br />
The URL can be used to link to this page
Your browser does not support the video tag.