My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-29_REPORT - M2007026
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2007026
>
2015-05-29_REPORT - M2007026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:00:57 PM
Creation date
6/1/2015 9:30:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007026
IBM Index Class Name
REPORT
Doc Date
5/29/2015
Doc Name
Annual Fee, Report & Map
From
Colowyo Coal Company
To
DRMS
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As an intermittent status (IS) operator the following information is required with <br />submittal of the annual report. A description of the condition of the operation at the <br />time it entered IS; along with a description of the current condition of the operation, <br />supplemented with maps. A description of the measures that have been and will be <br />implemented to comply with reclamation and performance standards and a description of <br />the plans for resumption of mining. <br />A. Description of the Condition when the Operation Entered IS <br />1. When Colowyo entered into IS status the operation was at a steady state. Material <br />was being mined from the toe of the outcrop as needed or dozed down to the toe <br />and mined accordingly. Operations and mining methods have not changed since <br />the permit was issued. <br />B. Description of Current Conditions of the Operation <br />1. As of 2014 the outcrop of rock being mined is a steady state and when material is <br />needed it is mined from the toe of the slope, or some material is dozed down to <br />the toe and mined accordingly. Please see Map 1 which delineates the mining <br />area (disturbance boundary). <br />C. Description of Reclamation and Performance Standards <br />1. Mining of the Neilson Pit is occurring as needed and reclamation of the Neilson <br />Pit will not commence until mining is complete. Once mining is complete, <br />Colowyo will reclaim the Nielson Pit in accordance with the Section 6.3.4 Exhibit <br />D - Reclamation Plan of its permit to mine. <br />VII. Site Contact Information <br />Contact information for the Neilson Pit has been updated in 2015, and the revised <br />information has been provided on the 110c Annual Report form. <br />
The URL can be used to link to this page
Your browser does not support the video tag.