My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-26_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2015-05-26_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:00:44 PM
Creation date
5/26/2015 10:24:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
5/26/2015
Doc Name
Midterm Review Memo
From
Jared Ebert
To
Brock Bowles
Type & Sequence
MT7
Email Name
JLE
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Roll. Res <br />0.90 Minutes <br />Maneuver and Spread Time: <br />(%) <br />0.70 Minutes <br />Job Condition Correction: <br />(min) <br />Site Altitude: 4850 feet <br />5.00 <br />7.00 <br />Scraper <br />Push Dozer Source <br />5.00 <br />Altitude Adj: <br />1.000 <br />NA (CAT HB) <br />5.00 <br />Job Efficiency: <br />0.830 <br />NA (CAT HB) <br />Net Correction: <br />0.830 <br />NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) Travel Time <br />(%) <br />(%) <br />(%) <br />(min) <br />1 1900.00 2.00 <br />5.00 <br />7.00 <br />944 2.06 <br />2 200.00 15.00 <br />5.00 <br />20.00 <br />270 0.66 <br />Haul Time: 2.72 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />200.00 <br />-15.00 <br />5.00 <br />-10.00 <br />1514 <br />0.20 <br />2 <br />1900.00 <br />-2.00 <br />5.00 <br />3.00 <br />2666 <br />0.81 <br />Return Time: <br />1.01 <br />minutes <br />Total Scraper team cycle time: <br />5.33 <br />minutes <br />Adjusted for job conditions: <br />191.54 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />383.08 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />383.08 <br />LCY/Hour <br />Unadjusted unit production/hour: 230.77 LCY/Hour <br />Optimal Number of Scrapers per push dozer <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 7.58 Hours <br />Unit cost: $1.330 /LCY Total job cost: $3,864 <br />
The URL can be used to link to this page
Your browser does not support the video tag.