My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-26_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2015-05-26_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:00:44 PM
Creation date
5/26/2015 10:24:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
5/26/2015
Doc Name
Midterm Review Memo
From
Jared Ebert
To
Brock Bowles
Type & Sequence
MT7
Email Name
JLE
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: Topsoil 1.2 -Acre CRDA 1 Access Road, and 2.4 -acre Pond 6 & 10 <br />Site: Roadside Portals Permit Action: MT7 Permit/Job#: C1981041 <br />PROJECT IDENTIFICATION <br />Task #: 107 State: Colorado <br />Date: 5/12/2015 County: Mesa <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 623G <br />-Dozer: NA <br />Abbreviation: None <br />Filename: C041-107 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraper Work Team Support Eauipment Maintenance Eauipment <br />Total work team cost/hour: $509.66 <br />MATERIAL QUANTITIES <br />Initial volume: 2,904 CCY Swell factor: 1.000 <br />Loose volume: 2,904 LCY <br />Source of estimated volume: Exhibits 9A, 9B, 51 and 52 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$75.81 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$140.00 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$39.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$254.83 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$509.66 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $509.66 <br />MATERIAL QUANTITIES <br />Initial volume: 2,904 CCY Swell factor: 1.000 <br />Loose volume: 2,904 LCY <br />Source of estimated volume: Exhibits 9A, 9B, 51 and 52 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,550 lbs/LCY <br />Material description: <br />Earth - Dry packed <br />Rated Payload: <br />55,200 pounds <br />Payload Capacity: <br />21.65 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />18.00 <br />LCY <br />Heaped Volume: <br />23.00 <br />LCY <br />Average Volume: <br />20.50 <br />LCY <br />Adjusted Capacity: <br />20.50 <br />LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.