Laserfiche WebLink
Mr. Lewicki <br />Page 7 <br />May 21, 2015 <br />41. Exhibit G states raw gravel crushing will occur. However, a crusher is not listed in the <br />Mining Plan under Section 3.0 Gold and Gravel Mine Facilities. Please clarify if gravel <br />crushing will occur. If so, specify where crushing will occur and revise the Mining Plan <br />accordingly. <br />6.4.8 Exhibit H — Wildlife Information <br />No comment. <br />6.4.9 Exhibit I — Soils Information <br />42. Please verify that topsoil from the JRS Mining LLC (M-2013-074) operation was salvaged <br />and specify the volume of a material which has been stockpiled. <br />6.4.10 Exhibit J — Vegetation Information <br />No comment. <br />6.4.11 Exhibit K — Climate <br />No comment. <br />6.4.12 Exhibit L — Reclamation Costs <br />43. The Division will calculate the required financial warranty once all of the adequacy issues <br />have been addressed. <br />6.4.13 Exhibit M — Other Permits and Licenses <br />44. The Applicant has stated that an APEN for emissions is not likely to be required since annual <br />production will be under 70,000 tons. Please specify if individual APENs will be needed for <br />the processing equipment and mining equipment. <br />45. Item No. 5 under Exhibit M states a Stormwater Management Plan is not needed since the <br />site will contain the 100 year 24 hour runoff. All permitted operations are required to have a <br />Stormwater Management Plan, but not necessarily a Stormwater Discharge Permit. In <br />addition, the Applicant has not demonstrated that runoff from a 100 year 24 hour <br />precipitation event will be contained on site. Please revise this statement accordingly. <br />46. Please commit to providing the Division with copies of all permits which have or will be <br />obtained for this operation. <br />