Laserfiche WebLink
Chris Gilbreath <br />Page 2 <br />20 May 2015 <br />area as being temporary fill and not permanent fill. Please review section line B -B' with <br />regards to the permanent and temporary portions of the fill and correct as necessary. <br />6. Map 12 shows the Taylor Tributary Ditch as being constructed from approximately stations <br />0+00 to 15+00 and stations 26+00 to 35+00, with the remaining stations being shown as <br />"future" construction. It is the Division's belief that this ditch has been constructed from <br />stations 0+00 to 40+00. Please review the Taylor Tributary Ditch as it is shown on Map <br />12 and correct as necessary (please note, some portions of the ditches carry over to Map <br />12A, which will also need to be reprinted and resent). <br />7. Map 12 shows the Taylor Ditch as being "future" construction. It is the Division's belief that <br />this ditch has been constructed in its entirety. Please review the Taylor Ditch as it is shown <br />on Map 12 and correct as necessary (please note, some portions of the ditches carry over <br />to Map 12A, which will also need to be reprinted and resent). <br />8. Map 12 shows the East Taylor Ditch as being constructed from approximately stations 20+00 <br />to 34+00, with the remaining stations being shown as "future" construction. It is the <br />Division's belief that this ditch has been constructed from stations 0+00 to 43+00. Please <br />review the East Taylor Ditch as it is shown on Map 12 and correct as necessary (please <br />note, some portions of the ditches carry over to Map 12A, which will also need to be <br />reprinted and resent). <br />9. Map 12 shows the Prospect Ditch as being constructed from approximately stations 0+00 to <br />6+00 and with the remaining stations being shown as "future" construction. It is the <br />Division's belief that this ditch has been constructed in its entirety. Please review the <br />Prospect Ditch as it is shown on Map 12 and correct as necessary (please note, some <br />portions of the ditches carry over to Map 12A, which will also need to be reprinted and <br />resent). <br />10. Map 12 shows the North Tributary, East Pit Ditch as being constructed from approximately <br />stations 0+00 to 6+00 and with the remaining stations being shown as "future" construction. <br />It is the Division's belief that this ditch has been constructed in its entirety. Please review <br />the North Tributary, East Pit Ditch as it is shown on Map 12 and correct as necessary <br />(please note, some portions of the ditches carry over to Map 12A, which will also need to <br />be reprinted and resent). <br />11. Map 12 shows the Final East Pit Ditch as being constructed from approximately stations <br />0+00 to 6+00 and with the remaining stations being shown as "future" construction. It is the <br />Division's belief that this ditch has been almost entirely constructed. Please review the <br />Final East Pit Ditch as it is shown on Map 12 and correct as necessary (please note, <br />