Laserfiche WebLink
ACTION TAKEN TO PREVENT RECURRENCE: The need to loosen flange for clean-out of line <br />blockage is not common; however, team will be better prepared for larger quantity of release <br />when cleanout need next occurs. Engineering team is reviewing improved design for valves and <br />pipeline to facilitate cleanout without having to loosened flange. <br />GENERAL REMARKS: Release was contained entirely within currently disturbed area. Residue <br />from spill was non -hazardous baking soda, which was cleaned up promptly and completely. Team <br />preparation provided for quick action to contain the larger -than -expected release. <br />Signed: -.';';1-: v' <br />Title: Kirk Daehling, Natural Soda Plant Manager <br />Date: - 2 " 2- <br />Daub <br />Daub & Associates, Inc. Page 2 of 2 Undesirable Event Report <br />May 12, 2015 <br />