My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-13_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-05-13_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:00:16 PM
Creation date
5/15/2015 8:49:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
5/13/2015
Doc Name
CQA Report - weeks ending 4/25/15 and 5/2/15
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. gt; <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: April 25, 2015 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 4.19.2015 through 4.25.2015 <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 40°F to 53°F Cloud Cover: Clear to cloudy <br />Lows: 29°F to 34°F Precipitation: None <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Note: An Amec Foster Wheeler field professional monitored fill material temperatures during fill <br />placement; average structural fill temperatures were above 32°F. All construction materials <br />placed were verified as suitable, and construction methods were in accordance with project <br />technical specifications. <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred during the reporting period: <br />Phase 1 — One Cat D7 dozer graded the slope between the A and C bench between <br />approximately stations A15+00 and C17+00. <br />Phase 1 — One Cat 988 loader loaded multiple Cat 740 haul trucks with wet Structural Fill (SF) <br />material from the A bench between approximately stations A15+00 through A22+00 and hauled it <br />to the Dump 4 Surge stockpile area for possible future use. <br />Phase 1 — One Cat CS56 smooth drum vibratory roller compacted the finish graded subgrade <br />surface between the C and E benches upslope of stations C0+00 through C7+00. <br />Phase 1 — One Cat 289D skid steer loader and labor crew removed loose rock from the C bench <br />in the vicinity of stations C2+00 through C6+00. <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />E- <br />D=Day Shift N=Night Shift W= Weather <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 40°F to 53°F Cloud Cover: Clear to cloudy <br />Lows: 29°F to 34°F Precipitation: None <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Note: An Amec Foster Wheeler field professional monitored fill material temperatures during fill <br />placement; average structural fill temperatures were above 32°F. All construction materials <br />placed were verified as suitable, and construction methods were in accordance with project <br />technical specifications. <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred during the reporting period: <br />Phase 1 — One Cat D7 dozer graded the slope between the A and C bench between <br />approximately stations A15+00 and C17+00. <br />Phase 1 — One Cat 988 loader loaded multiple Cat 740 haul trucks with wet Structural Fill (SF) <br />material from the A bench between approximately stations A15+00 through A22+00 and hauled it <br />to the Dump 4 Surge stockpile area for possible future use. <br />Phase 1 — One Cat CS56 smooth drum vibratory roller compacted the finish graded subgrade <br />surface between the C and E benches upslope of stations C0+00 through C7+00. <br />Phase 1 — One Cat 289D skid steer loader and labor crew removed loose rock from the C bench <br />in the vicinity of stations C2+00 through C6+00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.