Laserfiche WebLink
and outlet of the sedimentation basin is protected from <br />scour. <br />These Construction Best Management Practices are <br />temporary in nature. The SWMP Operator is referred to the <br />Exhibit in the appendix of this Plan to determine which BMP=s <br />are specified where. Implementation of these BMP=s shall be <br />incorporated into mining activities as described herein. A <br />common sense approach is encouraged, with the goal of these <br />BMP=s being to prevent erosion from occurring during mining <br />and to effectively remove all sediment as a result of mining <br />from stormwater runoff leaving the construction site. The <br />Construction BMP=s may be removed upon final stabilization <br />of the site as described in that section of this SWMP. <br />Nonstructural BMP=s: <br />The purpose of implementing these nonstructural, BMP=s are <br />to prevent or reduce contamination of stormwater generated <br />runoff during operations. <br />The Operator shall make all those performing work aware <br />of the measures to be implemented on the mining site with <br />respect to their individual duties. This can be achieved by <br />educating these employees to the overall goal of this SWMP, <br />which is to limit stormwater runoff pollutants from leaving <br />the site. <br />Examples of Nonstructural BMP=s include: <br />a. Good Housekeeping <br />b. Waste Minimization <br />C. Preventative Maintenance <br />d. Spill Minimization, Prevention and Response <br />e. Education and Training <br />