Laserfiche WebLink
Table No. 5 <br />R.M. Hiner Construction Co., Inc. <br />Greeley Pit (M-1977-151) <br />GIC Direct Surface RF Factor = 23.7% per Poudre Prairie Decree <br />Fossil Creek Surface RF Factor = 20.1% per Poudre Prairie Decree <br />Number of GIC Shares in SWSP = 3.0 <br />Water Balance <br />Applegate <br />Group, Inc. <br />River Transit Loss = 0.25% per mile <br />Aurora Lease Transit Distance = 66.0 miles <br />Aurora Lease Transit Loss = 16.50% Date Revised: 3/20/2015 <br />ar hti a. no_t ai <br />Notes: <br />(A) Augmentation requirement equal to lagged depletions from Table 3 plus return flow obligations from Table 4 <br />(B) GIC projected deliveries for Year One of Projection - Decree Case No. 03CW348 <br />(C) Estimated GIC direct flow consumptive use credit per share. Calculated by removing surface return flow obligations from deliveries <br />(0) Fossil Creek Irpkected deliveries for Year One of Projection, Decree Case No. 03CW348 <br />(E) Estimated Fossil Creek consumptive use credit per share. Calculated by removing surface return flow obligations from deliveries <br />(F) Total GIC credit for all shares = [(C) +(Ell * (Number of GIC Shares in SWSP) <br />(G) Bucklen Pit SWSP excess credit lease during period April through October. Due to location, no transit loss assesed <br />(H) Aurora lease during the period November through March. Due to location, transit losses are assesed <br />(1) Aurora Lease Credit = (H) • (1 - PRPA Lease Transit Loss) <br />(J) Net Affect to River = (F) + (G) + (1) - (A) <br />N:\09131 Rex Hiner -Greeley Pit SWSP\Disciplines (Technical)\WRPM\Water Rights\SWSP\2015 SWSP\Greeley Pit 2015 SWSP.xlsx <br />GIC Direct <br />Flow <br />Fossil Creek <br />Reservoir <br />Bucklen Pit <br />Projected <br />Estimated <br />Projected <br />Estimated <br />Estimated Total <br />.SWSP <br />Aurora <br />Aurora <br />Net Affect <br />Month <br />Augmentation <br />GIC Direct <br />GIC Direct <br />Fossil Creek <br />Fossil Creek <br />GIC Credit <br />Excess Credit <br />Lease <br />Lease <br />to River <br />Requirement <br />Deliveries <br />Credit <br />Deliveries <br />Credit <br />for all shares <br />Lease <br />Amount <br />Credit <br />[ac -ft] <br />[ac -ft / share] <br />[ac -ft / share] <br />[ac -ft / share] <br />[ac -ft / share] <br />[ac -ft] <br />[ac -ft] <br />[ac -ft] <br />[ac -ft] <br />[ac -ft] <br />(A) <br />IB) <br />(C) <br />(D) <br />(E) <br />(F) <br />(G) <br />(H) <br />(1) <br />0) <br />Apr -15 <br />6.15 <br />1.69 <br />1.29 <br />0.03 <br />0.02 <br />3.94 <br />2.3 <br />0.00 <br />0.09 <br />May -15 <br />8.23 <br />3.38 <br />2.58 <br />0.00 <br />0.00 <br />7.74 <br />0.6 <br />0.00 <br />0.11 <br />Jun -15 <br />10.63 <br />3.29 <br />2.51 <br />0.06 <br />0.05 <br />7.67 <br />3.1 <br />0.00 <br />0.14 <br />Jul -15 <br />12.88 <br />3.33 <br />2.54 <br />0.31 <br />0.25 <br />8.37 <br />4.7 <br />0.00 <br />0.19 <br />Aug -15 <br />13.14 <br />3.08 <br />2.35 <br />0.61 <br />0.49 <br />8.51 <br />4.8 <br />0.00 <br />0.17 <br />Sep -15 <br />11.24 <br />3.09 <br />2.36 <br />0.18 <br />0.14 <br />7.50 <br />3.9 <br />0.00 <br />0.17 <br />Oct -15 <br />9.08 <br />2.45 <br />1.87 <br />0.00 <br />0.00 <br />5.61 <br />3.6 <br />0.00 <br />0.13 <br />Nov -15 <br />6.43 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />7.8 <br />6.51 <br />0.08 <br />Dec -15 <br />4.06 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />4.9 <br />4.09 <br />0.03 <br />Jan -16 <br />2.73 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />3.3 <br />2.76 <br />0.03 <br />Feb -16 <br />3.53 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />4.3 <br />3.59 <br />0.06 <br />Mar -16 <br />4.78 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />1 <br />5.8 <br />4.84 <br />1 0.06 <br />Total <br />92.88 <br />20.31 <br />15.50 <br />1.19 <br />0.95 <br />49.34 <br />1 23.0 <br />26.1 <br />21.79 <br />1 1.25 <br />Notes: <br />(A) Augmentation requirement equal to lagged depletions from Table 3 plus return flow obligations from Table 4 <br />(B) GIC projected deliveries for Year One of Projection - Decree Case No. 03CW348 <br />(C) Estimated GIC direct flow consumptive use credit per share. Calculated by removing surface return flow obligations from deliveries <br />(0) Fossil Creek Irpkected deliveries for Year One of Projection, Decree Case No. 03CW348 <br />(E) Estimated Fossil Creek consumptive use credit per share. Calculated by removing surface return flow obligations from deliveries <br />(F) Total GIC credit for all shares = [(C) +(Ell * (Number of GIC Shares in SWSP) <br />(G) Bucklen Pit SWSP excess credit lease during period April through October. Due to location, no transit loss assesed <br />(H) Aurora lease during the period November through March. Due to location, transit losses are assesed <br />(1) Aurora Lease Credit = (H) • (1 - PRPA Lease Transit Loss) <br />(J) Net Affect to River = (F) + (G) + (1) - (A) <br />N:\09131 Rex Hiner -Greeley Pit SWSP\Disciplines (Technical)\WRPM\Water Rights\SWSP\2015 SWSP\Greeley Pit 2015 SWSP.xlsx <br />