My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-08_REVISION - M1983139
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983139
>
2015-05-08_REVISION - M1983139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:00:07 PM
Creation date
5/8/2015 9:15:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983139
IBM Index Class Name
REVISION
Doc Date
5/8/2015
Doc Name
Adequacy Review No. 1
From
DRMS
To
City of Arvada - Sandra McDonald
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. McDonald <br />Page 2 <br />May 8, 2015 <br />ponds. In addition, please describe what steps will be taken to reclaim the sediment ponds <br />which are breached rather than backfilled. <br />5. The Operator has submitted a revised seed mix which includes all introduced grass species. <br />The existing seed mix is comprised entirely of native species and is an excellent seed mix for <br />the post- mining land use of rangeland. The proposed seed mix would also be acceptable; <br />however, the Division places an emphasis on establishing native vegetation. Please provide a <br />technical justification for not including any native species in the seed mix. <br />6. The proposed seed mix specifies a range for seeding rates. Please provide the Division with a <br />specific seeding rate, rather than a range. In addition, specify if the seed will be applied with <br />a drill or by broadcast methods. <br />7. The Operator is proposing to reduce the amount of topsoil to be replaced from 8" —12" to 2" <br />— 4 ". In order to approved the reduction of topsoil to be replaced the Operator must provide a <br />technical justification for the revision to the Reclamation Plan. The technical justification <br />should describe how reducing the amount of topsoil to be replaced will aid in achieving the <br />post - mining land use of rangeland. <br />This concludes the Division's preliminary adequacy review of this Technical Revision. Please <br />remember that the decision date for this Technical Revision is June 1, 2015. If you are unable to <br />provide satisfactory responses to any inadequacies prior to this date, it will be your <br />responsibility to request an extension of time to allow for continued review of this <br />Technical Revision. If there are still unresolved issues when the decision date arrives and no <br />extension has been requested, the Technical Revision will be denied. <br />If you have any questions, please contact me at (303)866 -3567 x8116. <br />Sincerely, <br />Michael A. Cu Ingham <br />Environmental Protection Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.