Laserfiche WebLink
d� <br />Boyd Irrigation Company <br />1100 let Street, Suite 300 <br />Greeley, Colorado 80631 <br />Roger Schmidt <br />President <br />970 - 371 -3728 <br />Eric Reckentine <br />Vice - President <br />April 28, 2015 <br />Carl Hill <br />83rd Joint Venture, LLC <br />2815 83rd Avenue <br />Greeley, CO 80634 <br />Connie Davis <br />Aggregate Industries -WCR, Inc. <br />P.O. Box 337231 <br />Greeley, CO 80633 <br />Dear Mr. Hill and Ms. Davis, <br />RECEIVED <br />NAY (14 2015 <br />DMSION OF RECLAMATION <br />MINING AND SAFETY <br />Lory Stephens <br />Secretary/Treasurer <br />970 - 350 -9812 <br />Leif Lesoing <br />Director <br />n -19g07 - o %q <br />The Boyd Irrigation Company (BIC) is writing to inform you about an upcoming flood - <br />repair project which will be completed partially in the BIC's existing prescriptive <br />easement on property located at 4503 W F St. As you know, 83rd Joint Venture, LLC <br />(83rd) is the owner of this property located at 4503 W F Street (Property), and Aggregate <br />Industries -WCR, Inc. (AI) holds a Colorado Division of Reclamation Mining and Safety <br />(DRMS) permit at that location. <br />In this project, BIC will repair flood damage to Boyd- Freeman Ditch infrastructure and <br />adjacent City of Greeley property with final design and project bidding anticipated to <br />occur this summer with construction to follow this falls or winter. An ancillary objective <br />is to enable the gravel pit embankment restoration and stabilization effort DRMS requires <br />of Al. The BIC's ditch infrastructure and the gravel pit are located in the 100 -year <br />floodplain of the Cache la Poudre River and have been subject to frequent flood flows <br />and resulting damage. <br />BIC's project will encompass the following scope of work: <br />• Replacing the blow -out pipe with a siphoned pipe section <br />• Protecting that new siphon from flood damage with a sheet pile wall and <br />associated downstream buried rip rap <br />