My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-04_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-05-04_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:58 PM
Creation date
5/5/2015 9:46:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
5/4/2015
Doc Name
Weekly CQA Report-Week ending 4/18/15
From
CC&V
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: April 18, 2015 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 4.12.2015 through 4.18.2015 <br />Days <br />S <br />M <br />T <br />W <br />T <br />I F I <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D =Day Shift N =Night Shift W= Weather <br />Ambient Temperature Ranges During Week I Weather Conditions During Week: <br />Highs: 32 °F to 61'F Cloud Cover: Clear to cloudy <br />Lows: 16 °F to 32 °F Precipitation: None <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />Note: There were limited VLF construction activities on Friday and Saturday of this the reporting <br />period due to weather related issues — snow. <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Note: An Amec Foster Wheeler field professional monitored fill material temperatures during fill <br />placement, average structural fill temperatures were above 32 °F. Snow was removed from areas <br />prior to fill placement. All construction materials placed were verified as suitable, and construction <br />methods were in accordance with project technical specifications. <br />Structural Fill: <br />The following Structural Fill cut to fill and grading activities occurred during the reporting period: <br />Phase 1 - One Cat 345 excavator loaded Cat 740 haul trucks with Structural Fill (SF) material that <br />was pushed down the slopes during grading activities between the A and E benches, in the <br />vicinity upslope of station C14 +00. The fill was hauled and spread as SF between the Phase 1 C <br />and E benches in the vicinity of stations C14 +00 and E8 +00. <br />Phase 1 - One Cat D10 dozer rough graded the slopes between the C and Q benches upslope of <br />stations C4 +00 through C9 +00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.