Laserfiche WebLink
CONSTRUCTION ACTIVITY NO.4 <br />Reclamation <br />Activity <br />Install Coal Handling Facilities <br />065 <br />Demolish and Remove All Structures <br />Truck Loadout Walls <br />$ 8,254.25 <br />Retaining Walls (2) <br />$ 2,146.11 <br />East Sump Wall <br />$ 722.25 <br />East Sump Roof <br />$ 247.62 <br />Truck Dump Floor <br />$ 1,911.82 <br />Sump Floor <br />$ 229.42 <br />Conveyor Floor <br />$ 677.11 <br />CMP Headwall <br />$ 318.13 <br />Batch Weigh System Structure <br />$ 7,596.16 <br />Floor <br />$ 1,274.55 <br />Footing <br />$ 1,530.92 <br />Stacker Conveyor <br />$ 7,299.98 <br />Radial Stacker Conveyor <br />$ 6,488.87 <br />Loading Conveyor <br />$ 27,743.06 <br />Reclaim Tunnel <br />$ 54,478.05 <br />Escape Tube <br />$ 511.92 <br />Coal Sampling Building <br />$ 220.87 <br />Floor <br />$ 255.64 <br />Shop /Office Trailer <br />$ 441.75 <br />MCC Building <br />$ 441.74 <br />Floor <br />$ 509.82 <br />Footing <br />$ 1,051.19 <br />6,000 Gallon Fuel Tank <br />$ 6,657.96 <br />Power Lines <br />$ 4,911.94 <br />Transformer <br />$ 2,282.50 <br />96" Culvert Removal <br />$ 5,018.85 <br />Clean up Material Storage Area <br />$ 389.17 <br />Subtotal Construction Activity #4 Direct Costs <br />$ 143,611.65 <br />INDIRECT COSTS <br />Liability Insurance 2.02% <br />$ 2,900.96 <br />Performance Bond 1.05% <br />$ 1,507.92 <br />Job Superintendent 81 <br />$ 6,088.43 <br />Profit 10% <br />$ 14,361.20 <br />Contract Amount (Direct + O & P) <br />$ 168,470.15 <br />Legal - Engineering - Project Management <br />Financial Warranty <br />$ - <br />Engineering work and /or contract bid preparation 6% <br />$ 10,108.21 <br />Reclamation management and /or administration 4.5% <br />$ 7,581.16 <br />Contingency <br />Total Indirect Costs <br />$ 17,689.37 <br />Rounding Adjustment <br />$ 0.04 <br />Construction Activity #4 Total Bond Amount (direct + indirect) <br />$ 186,159.56 <br />TR -03 3.02 -63 04/29/15 <br />