My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-29_REVISION - C2010088 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010088
>
2015-04-29_REVISION - C2010088 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:42 PM
Creation date
5/4/2015 1:51:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Revision
Doc Date
4/29/2015
Doc Name
2nd Adequacy Letter
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR3
Email Name
ZTT
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION ACTIVITY NO. 3 <br />Reclamation <br />Activity <br />Install Rail and Construct Bridge <br />048 <br />Remove Fill from Reed Wash Bridge Area to Facilities Area <br />$ 11,462.00 <br />049 <br />Reconstruct Reed Wash at Rail Bridge <br />$ 42,013.54 <br />061 <br />Hydroseed Reconstructed Reed Wash Bridge Area <br />$ 6,254.00 <br />065 <br />Demolish and Remove All Structures <br />Rail Road Track <br />$ 97,890.95 <br />Ballast <br />$ 10,742.18 <br />Remove Bridge over Reed Wash <br />$ 65,667.53 <br />Subtotal Construction Activity #3 Direct Costs <br />$ 234,030.19 <br />INDIRECT COSTS <br />Liability Insurance 2.02% <br />$ 4,727.41 <br />Performance Bond 1.05% <br />$ 2,457.32 <br />Job Superintendent 132 <br />$ 9,921.73 <br />Profit 10% <br />$ 23,403.00 <br />Contract Amount (Direct + O & P) <br />$ 274,539.64 <br />Legal - Engineering - Project Management <br />Financial Warranty <br />$ - <br />Engineering work and /or contract bid preparation 6% <br />$ 16,472.38 <br />Reclamation management and /or administration 4.5% <br />$ 12,354.29 <br />Contingency <br />$ - <br />Total Indirect Costs <br />$ 28,826.67 <br />Rounding Adjustment <br />$ 0.07 <br />Construction Activity #3 Total Bond Amount (direct + indirect) <br />$ 303,366.38 <br />TR -03 3.02 -62 04/29/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.