My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-29_REVISION - C2010088 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010088
>
2015-04-29_REVISION - C2010088 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:42 PM
Creation date
5/4/2015 1:51:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Revision
Doc Date
4/29/2015
Doc Name
2nd Adequacy Letter
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR3
Email Name
ZTT
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION ACTIVITY NO. 1 <br />Reclamation <br />Activity <br />Construct Haul Road No. 1 and 3 Sediment Ponds <br />001 <br />Remove Fill from Haul Road #1 and Place on Facilities Area <br />$ 15,840.00 <br />015 <br />Compact Backfilled and Regraded Surfaces <br />2.47 Ac of 21.5 Ac = 11 % of $11,331 <br />$ 1,246.41 <br />020 <br />Rip Regraded Surfaces Prior to Topsoil Replacement <br />0.07 Ac @ $495.239/ Ac <br />$ 34.67 <br />021 <br />Rip Haul Road # I, #2 and Access Road ($495.266/Ac) <br />Haul Road #1 = 2.12 Acres <br />$ 1,049.96 <br />030 <br />Regrade Haul Road #1 (1.73 Ac) <br />$ 212.00 <br />045 <br />Regrade Pond 1 (0.39 Ac) <br />$ 5,647.00 <br />046 <br />Regrade Pond 2 (0.22 Ac) <br />$ 5,647.00 <br />047 <br />Regrade Pond 3 (0.12 Ac) <br />$ 5,647.00 <br />Coverfill Stockpile (0.61 Ac) Excess Material From Ponds <br />050 <br />Regrade Ditches <br />040 <br />Finish Grade Disturbed Areas Prior to Seeding 21.5 Ac Total <br />3.07 Ac @ $84.68/Ac <br />$ 260.02 <br />060 <br />Seed Areas WhereTopsoil Was Replaced <br />0.07 Acres at Pond 2 Only @ $2455.875/Ac <br />$ 171.91 <br />063 <br />Weed Control - Spray Area 3 Times During Liability Period <br />3.07 Ac of 21.5 Ac = 14% of $6,290.43 <br />$ 880.60 <br />070 <br />Site Maintenance, Rill and Gully Repair and SAE Repair <br />3.07 Ac of 21.5 Ac = 14% of $46179.84 <br />$ 6,465.18 <br />075 <br />Mobilize Demobilize Equipment for Initial Reclamation <br />3.07 Ac of 21.5 Ac = 14% of $5.031.31 <br />$ 704.38 <br />076 <br />Mobilize Demobilize Equipment for Site Maintenance <br />3.07 Ac of 21.5 Ac = 14% of $28,967.46 <br />$ 4,055.44 <br />65a <br />Pump, Haul and Dispose of Pond Water Off -Site <br />$ 450,000.00 <br />Subtotal Construction Activity #1 Direct Costs <br />$ 497,861.58 <br />INDIRECT COSTS <br />Liability Insurance 2.02% <br />$ 10,056.80 <br />Performance Bond 1.05% <br />$ 5,227.55 <br />Job Superintendent 280.8 <br />$ 21,106.88 <br />Profit 10% <br />$ 49,786.20 <br />Contract Amount (Direct + O & P) <br />$ 584,039.01 <br />Legal - Engineering - Project Management <br />Financial Warranty <br />$ - <br />Engineering work and /or contract bid preparation 6% <br />$ 35,042.35 <br />Reclamation management and /or administration 4.5% <br />$ 26,281.76 <br />Contingency <br />$ - <br />Total Indirect Costs <br />$ 61,324.11 <br />Rounding Adjustment <br />$ 0.13 <br />Construction Activity #1 Total Bond Amount (direct + indirect) <br />$ 645,3637 <br />TR -03 3.02 -60 04/29/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.