Laserfiche WebLink
SECTION 3.02 PERFORMANCE BOND REQUIREMENTS <br />In accordance with Rules 3.02.1(5)(b) and (6) the applicant hereby requests incremental <br />bonding for the Fruita Loadout. <br />A cumulative bond schedule listing the construction activities to be covered by <br />bond is provided. The construction activity areas for cumulative bonding are: <br />1. Construct Haul Road No. 1 and 3 Sediment Ponds <br />2. Construct Rail Bed, Light Use Roads #1 and #2, Ditches, SAES, Haul Road #2 and <br />Access Road. <br />3. Install Rail and Construct Bridge <br />4. Install Coal Handling Facilities <br />Each scheduled incremental bond amount will be filed with the Division at least thirty <br />(30) days prior to the commencement of succeeding construction activities. <br />Incremental bonding areas are shown on new Map 23. <br />The bonding cost for each construction activity is calculated using the detailed <br />reclamation estimate prepared by the DRMS. The reclamation tasks are sorted and <br />summarized by construction activity. The bonding costs for each construction task are <br />as follows: <br />Construction Activity <br />Total Bond Amount <br />1 <br />645,363.25 <br />2 <br />571,993.83 <br />3 <br />303,366.38 <br />4 <br />186,159.56 <br />Total <br />1,706,883.02 <br />A detailed estimate of the cost of the construction activities is shown on the following <br />pages. A detailed estimated timetable is not provided since the concept involved in this <br />case is to incrementally bond the facility as it is being constructed. Should construction <br />activities cease for some reason, the DRMS would have adequate bond to reclaim the <br />construction activities completed through the time the construction activities stopped. <br />TR -03 3.02 -59 04/29/15 <br />