Laserfiche WebLink
EXHIBIT L <br />RECLAMATION COSTS (cont) <br />ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS: <br />0 <br />39 I <br />, <br />' f <br />Unit Cost <br />1. <br />Revegetation <br />includes grass seed mix, mulch <br />and fertilizer <br />and labor to drill . . . . $1,000.00 <br />/AC. <br />2. <br />Re- spreadinglsoil <br />and /or growth' media with <br />627 -E MOTOR SCRAPER, <br />HAUL DISTANCE LESS THAN 900 <br />6 0 . 6 � /YD' <br />3. <br />Grade and shape <br />seed beds, 140G motor grader <br />$59 .54 /ac <br />4. <br />Cut /fill slopes, <br />D8N Dozer push distance less <br />than 60 feet <br />f <br />41 . 0 � /YD' <br />5. <br />Secondary Revegetation <br />seeding only . . . . . <br />1 <br />$400.00 /AC <br />i <br />RECLAMATION COSTS <br />1. <br />Revegetation, <br />20.00 ac @ $1, 000.00/ac <br />$20,000.00 <br />2. <br />Resoiling, 16,133 <br />yd' *1.12* 60.64/yd' <br />10,948.89 <br />3. <br />Grading and <br />shaping 20.00 ac. @ $59.54/ac <br />1,190.72 <br />4. <br />Cut /fill slopes, <br />2,600 yd' * 1.12 @ 41.0G/yd3 <br />1,193.27 <br />S. <br />Secondary revegetation <br />20.00 ac x 40% x $1000.00/ac <br />8,000.00 <br />6. <br />Weed control <br />costs i 2,000.00 <br />Net Total <br />$43,332.88 <br />9. <br />Indirect costs <br />Mobilization <br />3,652.68 <br />Insurance <br />Bond, & Profit j <br />!, <br />5,858.60 <br />10. <br />Administration <br />costs <br />2,459.57 <br />TOTAL ESTIMATE <br />$55,303.73 <br />CURRENT BOND IS $571,664.00 <br />i <br />RECOMMEND BOND <br />i <br />BE SETA T $57,664.00 <br />I t <br />EQUIPMENT LISTED IN THIS ESTIMATE <br />I <br />IS USED FOR THE CALCULATIONS AND SIMILAR TYPES MAY BE USED IN THE ACTUAL RECLAMATION <br />ACTIVITIES AT THE MINE. <br />f <br />SOURCE OF FIGURED USING, CAT <br />HANDBOOK #38 AND RENTAL COSTS FROM MEANS FOR 83% EFFICIENCY, <br />Z <br />t <br />FOR SOUTHERN COLORADO <br />0 <br />39 I <br />, <br />