Laserfiche WebLink
EXHIBIT L <br />This reclam� <br />that no more thei <br />any one time. 0J <br />partially mined ( <br />ing 8.0 acres woi <br />the estimate inc' <br />3:1) at 2.65 cyd, <br />the current state <br />the amendment ar( <br />This means that <br />to knock down th( <br />medium will be n( <br />have to grade an( <br />revegetate 20.00 <br />spread is based c <br />figure includes <br />We have no incluc <br />since all of the <br />A 627C Cat Y <br />to resoil the arc <br />ment will be use( <br />A D8N Cat dozer ( <br />mine face and cr( <br />RECLAMATION COSTS (Revised 12116/13) <br />�tion cost estimate in based on the assumption <br />i 20 acres will need some form of reclamation at <br />this 20 acres, 121.0 acres would be stripped, <br />it being used as plant site area and the remain - <br />i,ld be partially reclaimed areas. In addition, <br />_udes a 1000 feet of mine face grading (0.5:1 to <br />linear ft (15ft high). This estimate is based <br />is at the mine since mining will progress into <br />;a and not increase the amount of disturbance. <br />?,912 cubic yards of cut /fill sloping be needed <br />mine face and 18,070 yard of topsoil /growth <br />ceded on the area t'o be reclaimed. We would also <br />i shape 20.00 acres of seed bed area and <br />(ac. ±. The amount of topsoil that will be re- <br />)n an average of 6 finches. The revegetation cost <br />ertilizer, grass seed, mulch and drilling costs. <br />led the cost to demolish concrete foundations <br />Iequipment on site is portable. <br />otor scraper or similar equipment will be used <br />:a and a 140G Cat motor grader or similar equip - <br />1 to shape the seed bed, and the resoiled areas. <br />6r similar equipment will be used to cut down the <br />I <br />ate slopes. <br />_ RECLAMATION ACTIVITY <br />z <br />AREA (UNITS <br />AC., LFT, YDS <br />OR PIECES) <br />QUANTITY <br />Phase 1 <br />RESOIL (ac) <br />20.00 <br />REVEGETATEI(ac) <br />20.00 <br />GRADE AND SHAPE (ac) <br />20.00 <br />CUT /FILL SLOPES (Ift) <br />1,000 <br />DATA <br />EXPLANATION <br />QUANTITY <br />UNITS <br />Soil depth (average) <br />6.00 <br />Inches <br />Cut/fill slope reconstruction <br />2.60 <br />cy /Lft <br />Swell factor <br />; 1.12 <br />Weed control costs <br />$2,000.00 <br />1 Per year <br />