Laserfiche WebLink
MINING PLAN <br />EXHIBIT D (CONT) <br />The plan to keep the plant site and stockpile area close by <br />the working face to reduce raw material haul distances and keep <br />all disturbance in and around the processing area. The overbur- <br />den screened from the material will then be placed on the previ- <br />ously mined areal, topsoil and seeded as mining progresses thru <br />the property. j <br />Originally it was estimated that mine would last approxi- <br />mately 27 years but due to the demand for material and the amount <br />of minable material it has only been 9 years. By adding this new <br />area we expect to extend the mines life for an additional 23 <br />years ±. 1 <br />Please refer to the Mining Timetable following this text for <br />the areas in the mine and the revised estimate on the life of the <br />mine. <br />} <br />CHANGES TO MINING PLAN <br />The following changes are a result of the site specific <br />conditions found Ion the Biber property but have no effect on area <br />remaining to be mined on the Howell property. <br />The depth of the deposit on the amendment area is different <br />then that found in the Existing permit. In this area it ranges <br />from 5 feet to possibly 35 feet deep, along the upland deposit. <br />No groundwater will be encountered on this area as the final area <br />will be graded to preserve the natural drainage across the site. <br />This mine will be a year round operation with no planned extended <br />shutdowns. However, depending on the demand for material and <br />market conditions, the mine may bey operated on an intermittent <br />status. It is proposed to use a floating bond on 20 acres on this <br />operation. Reclamation will run concurrent with mining so on any <br />given area, when Imining begins reclamation will follow immedi- <br />ately to keep the amount of area disturbed at anyone time to the <br />maximum proposed It is planned that it will take approximately <br />three to four years after mining commences on the Biber property <br />before reclamation begins. Reclamation will be completed on the <br />last area mined on the Howell property when the mining operation <br />is moved to the north end of the Biber property. <br />It will then take between 3 to 5 years to establish the <br />reclaimed area back to rangeland that may be considered for <br />release by the Mined Land Reclamation Board or the Division of <br />Reclamation, Mining & Safety. The reclamation will be an ongoing <br />process as soon as the first section is deemed mined -out, and <br />mining and reclamation will follows natural progression to the <br />south with final reclamation as the ultimate goal. The amount of <br />5 <br />