Laserfiche WebLink
Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.900 <br />(SSD -FC) <br />0.786 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3972 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />805.52 LCY /hr <br />3222.08 LCY /hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.425/LCY <br />Total job time: <br />Total job cost: <br />64.49 Hours <br />$88,392 <br />