Laserfiche WebLink
Task description: Regrad <br />Site: Trapper Mine <br />BULLDOZER WORK <br />BC Road <br />Permit Action: PR07 <br />PROJECT IDENTIFICATION <br />Task #: GO1 State: Colorado <br />Date: 4/20/2015 County: Moffat <br />8:57:11 AM <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EOL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D10T - IOSU <br />574 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Permit/Job #: C1981010 <br />Abbreviation: None <br />Filename: C010 -GO1 <br />Total unit Cost/Hour: $342.65 <br />Total Fleet Cost/Hour: $1.370.61 <br />MATERIAL OUANTITIES <br />Initial Volume: 166,237 <br />Swell factor: 1.250 <br />Loose volume: 207,796 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Appx. A; Table A -61 <br />Cat Handbook <br />Average push distance: 80 feet <br />Unadjusted hourly 2,028.0 LCY /hr <br />production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 10% <br />Average site altitude: 6,400 feet <br />Material weight: 2,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />0.750 <br />(AVG.) <br />Utilization % <br />Ownership Cost /Hour: <br />$120.17 <br />NA <br />Operating Cost/Hour: <br />$184.48 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $342.65 <br />Total Fleet Cost/Hour: $1.370.61 <br />MATERIAL OUANTITIES <br />Initial Volume: 166,237 <br />Swell factor: 1.250 <br />Loose volume: 207,796 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Appx. A; Table A -61 <br />Cat Handbook <br />Average push distance: 80 feet <br />Unadjusted hourly 2,028.0 LCY /hr <br />production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 10% <br />Average site altitude: 6,400 feet <br />Material weight: 2,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />0.750 <br />(AVG.) <br />1.000 <br />(CAT HB) <br />1.000 <br />(GEN_) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />