Laserfiche WebLink
Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(CAT HB) <br />1.200 <br />(S -BY -S) <br />0.800 <br />(POOR) <br />0.790 <br />(3 SHIFTS /DAY) <br />1.000 <br />(DOZ -OC) <br />1329 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.929 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.7023 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />626.17 LCY /hr <br />2504.68 LCY /hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.698/LCY <br />Total job time: <br />Total job cost: <br />18.48 Hours <br />$32,303 <br />