Laserfiche WebLink
BULLDOZER WORK <br />Task description: Ash Pit Regrade; Cross Section 2/3 <br />Site: Trapper Mine Permit Action: PR07 Permit/Job #: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: A02 State: Colorado <br />Date: 4/20/2015 County: Moffat <br />7:59:15 AM <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat DIIR - 11SU <br />850 <br />Semi - Universal <br />NA <br />3 per day <br />(CRG) <br />Abbreviation: None <br />Filename: C010 -A02 <br />Total unit Cost/Hour: $437.09 <br />Total Fleet Cost/Hour: $1,748.35 <br />MATERIAL QUANTITIES <br />Initial Volume: 46,277 <br />Swell factor: 1.000 <br />Loose volume: 46,277 LCY <br />Source of estimated volume: Appx. A Table A -41; DRMS Weighted AVG Push Dist. <br />& Slope <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />-15% <br />340 feet <br />891.6 LCY /hr <br />Consolidated stockpile 1.0 <br />6,900 feet <br />2,475 lbs /LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Source <br />'AVG.) <br />Utilization % <br />Ownership Cost /Hour: <br />$90.05 <br />NA <br />Operating Cost/flour: <br />$308.78 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.26 <br />NA <br />Total unit Cost/Hour: $437.09 <br />Total Fleet Cost/Hour: $1,748.35 <br />MATERIAL QUANTITIES <br />Initial Volume: 46,277 <br />Swell factor: 1.000 <br />Loose volume: 46,277 LCY <br />Source of estimated volume: Appx. A Table A -41; DRMS Weighted AVG Push Dist. <br />& Slope <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />-15% <br />340 feet <br />891.6 LCY /hr <br />Consolidated stockpile 1.0 <br />6,900 feet <br />2,475 lbs /LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Source <br />'AVG.) <br />