My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-12_PERMIT FILE - C1981014 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981014
>
2015-03-12_PERMIT FILE - C1981014 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:14 PM
Creation date
4/28/2015 9:28:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
3/12/2015
Section_Exhibit Name
4.14 BACKFILLING AND GRADING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is no necessity to cover potentially acid, alkaline, or toxic forming <br />materials since Southfield's mining and related activities will not result <br />in production or exposure of any of these materials. <br />In conjunction with mining and related operations at the Southfield Mine, <br />both coal processing waste and non -coal wastes are produced and disposed <br />of in compliance with all applicable regulations. Coal processing wastes, <br />or coal refuse resulting from coal preparation activities are transported <br />to a permanent refuse stockpile within the permit area. The refuse <br />stockpile area is designed, constructed, operated and maintained in full <br />compliance with all applicable regulatory provisions of Rules 2.05.3, <br />Operation Plan - Permit Area, 2.05.4, Reclamation Plan, and 4.10 -4.11, <br />Coal Processing Waste. <br />Non -coal solid wastes are collected and either hauled off -site by salvage <br />contractors or a contract disposal service. <br />• Normal backfilling and grading practices will result in significant <br />compaction and consolidation of fill material. Generally, to the extent <br />possible, regraded areas will be left in a roughened condition in order <br />to improve bonding between the regraded surface and subsequently placed <br />topsoil, and control surface runoff and erosion. <br />4.14.4 THIN OVERBURDEN <br />EFCI's operations doe not include any current or planned surface coal <br />mining activities; therefore this section of the performance standards is <br />not applicable. <br />4.14.5 THICK OVERBURDEN <br />EFCI's operations do not include any current or planned surface coal <br />mining activities; therefore this section of the performance standards is <br />• not applicable. <br />4.14 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.