Laserfiche WebLink
Upon completion of mining activities, all support facilities except those <br />approved for permanent retention to support the postmining land use will be <br />removed. Facilities currently approved for permanent retention include the <br />Truck Tunnel, Coal Laboratory Building, and facility area parking lot <br />comprising approximately 0.16 acres within the former employee parking area. <br />In addition, the rail spur at the loadout located near Florence will remain <br />at the request of the landowner. Where facilities are removed, the related <br />disturbance areas will be reclaimed by removing any gravel or surfacing <br />materials, grading the areas to the planned postmining configuration, re- <br />establishing drainage, scarifying the surface, replacing topsoil, an re- <br />establishing vegetation. The reclamation plan for these areas is more fully <br />described in Sections 2.05.4, Reclamation Plan, and 4.14, Backfilling and <br />Grading. <br />4.04 -2 Revised 5/13/04 <br />Permit Renewal RN-04 <br />