My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-23_ENFORCEMENT - C1981014 (2)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981014
>
2015-04-23_ENFORCEMENT - C1981014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:32 PM
Creation date
4/24/2015 1:31:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Enforcement
Doc Date
4/23/2015
Doc Name
Letter Regarding Extension Request from Operator
From
Rob Zuber
To
Virginia Brannon
Violation No.
CV2013002
Email Name
RDZ
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oF'Coto <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />** 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />1876 <br />EXTENSION OF TIME FOR ABATEMENT NOTICE <br />FOR NOTICE OF VIOLATION OR CESSATION ORDER FOR COAL OPERATION <br />TO: THE OPERATOR AND PERMITTEE OF THE MINE DESCRIBED BELOW <br />CESSATION ORDER NO.: <br />DATE NOV OR CO ISSUED: January 28, 2013 <br />MINE: Southfield Mine <br />OPERATOR (IF OTHER THAN PERMITTEE) <br />MAIL ADDRESS: <br />NOTICE OF VIOLATION NO.: CV- 2013 -002 <br />PERMIT NO.: C- 1981 -014 <br />COUNTY: Fremont <br />TYPE OF MINE: Underground /Non - Federal <br />PERMITTEE: Energy Fuels Coal Inc. <br />MAIL ADDRESS: P.O. Box 459 <br />Florence, CO 81226 <br />In (a) Notice of Violation No. CV- 2013 -002 , (b) Cessation Order No. , <br />the deadline for abatement of the practice, condition or violation described was fixed at <br />March 27, 2015 <br />It is hereby found that the operator has failed to abate such practice, condition or <br />violation, or cannot complete abatement within the time allowed, but that such failure is not <br />due to lack of diligence on the part of the operator. The time for abatement is therefore <br />extended to July 31, 2015 . <br />The conditions, practices or violation as to which this extension applies are as follows: <br />Abatement Step No. 1: Remove obstruction from MW -NW, establish a replacement water monitoring well that <br />intercepts the mined coal seam, or show that the well is functional for intended purpose. <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />J , <br />B f <br />y �` <br />(Signature of Authorized Representative) [f Divi ion Director, if extension is , <br />beyond 90 days, pursuant to Rule 5.03.2(2)(e)]* <br />Date of Issue: April 23, 2015 The Division's justification for approving <br />this extension beyond 90 days is included <br />in an associated letter. <br />Robert D. Zuber, Environmental Protection Specialist II <br />(Please print name and title) <br />
The URL can be used to link to this page
Your browser does not support the video tag.