Laserfiche WebLink
Loloff Mine Groundwater Monitoring <br />Page 2 of 2 <br />April 23, 2015 <br />In the Technical Revision No. 1 request submittal, dated July 3, 2015, the Operator <br />proposed to install a recharge ditch along the west side of the pit to mitigate impacts if <br />there were impacts from the dewatering to the other wells adjacent to the pit. Please <br />provide the Division a plan to implement the recharge ditch construction and operation as <br />required by TR -01 within 30 days of the date of this letter. <br />If you have any questions, please contact me at 303 - 866 -3567 Ext. 8124. <br />Sincerel , <br />Peter S. Hays <br />Environmental Protection Specialist <br />Cc: Wally'Erickson, DRMS <br />J.C. York, AT Consulting, Inc. (by email) <br />