My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-23_HYDROLOGY - C1996083
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1996083
>
2015-04-23_HYDROLOGY - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 2:04:20 PM
Creation date
4/23/2015 8:29:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Hydrology
Doc Date
4/23/2015
Doc Name
1st Quarter 2015 Quarterly Pond Inspection Report
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2015
Report Quarter_Month
1
Permit Index Doc Type
Sediment Pond Inspections
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CWDA No. 3 <br />#01349 -0001 ;' Hudd[eston -Berry <br />04/20/15 ��'% enmrmss r= me, uc <br />Site Visit Observations <br />HBET visited the site on March 11, 2015. At the time of our visit, gob on top of CWDA No. 3 <br />was being moved around and compacted. In addition, wet gob was being placed in the drying <br />area at the southeastern corner of CWDA No. 3. <br />At the time of our site visit, a very small quantity of water was emanating from the underdrain <br />below the center of CWDA No. 3. In addition, several wet areas were observed along the south <br />side of CWDA No. 3. It was unclear if these areas reflected seepage from gob dewatering or if <br />they were simply wet from snowmelt. These areas will be re- evaluated during the 2nd Quarter <br />2015 site inspection. In general, no evidence of instability of other adverse conditions were <br />observed at CWDA No. 3. <br />General <br />In general, based upon the results of the recent VWP monitoring data and our observations at the <br />site, HBET does not believe that there is any reduction in the stability of CWDA No. 3. <br />Continued quarterly monitoring of piezometers is recommended. <br />We are pleased to be of service to your project. Please contact us if you have any questions or <br />comments regarding the contents of this report. <br />Respectfully Submitted: <br />Huddleston -Berry Engineering and Testing, LLC <br />Michael A. Berry, P.E. <br />Vice President of Engineering <br />X:\2008 ALL PROJECTS \01349 -Bowie Resources, LLC \01349 -0001 Bowie Mine\200 - Geo \Gob 3\Imtr ntation Monitoring\2015 \01349 -0001 LR042015.doe 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.