My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-23_HYDROLOGY - C1996083
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1996083
>
2015-04-23_HYDROLOGY - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 2:04:20 PM
Creation date
4/23/2015 8:29:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Hydrology
Doc Date
4/23/2015
Doc Name
1st Quarter 2015 Quarterly Pond Inspection Report
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2015
Report Quarter_Month
1
Permit Index Doc Type
Sediment Pond Inspections
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CWDA No. 3 <br />#01349 -0001 ;' Hudd[eston -Berry <br />04/20/15 �;'% ensmmsst� =ra�,u� <br />Discussion of Vibrating Wire Piezometers <br />VWP -A Deep <br />VWP -A Deep was installed on October 6, 2014 near the northern edge of CWDA No. 3. VWP - <br />A Deep was installed in the foundation soil approximately eight feet below the bottom of the <br />gob. Since installation, the pore pressures recorded at VWP -A Deep have decreased. Due to the <br />limited time since installation, it is difficult to make any meaningful determinations regarding the <br />measured pore pressures and stability of the gob pile. However, HBET does not believe that the <br />pore pressure changes in VWP -A Deep are cause for concern regarding stability of the gob pile. <br />VWP A Shallow <br />VWP -A Shallow was installed on October 6, 2014 near the northern edge of CWDA No. 3. <br />VWP -A Shallow was installed approximately ten feet above the base of the gob. After <br />installation, the pore pressures dropped until November 2014. However, since that time, slight <br />increases in the pore pressures have been recorded at VWP -A Shallow. Due to the limited time <br />since installation, it is difficult to make any meaningful determinations regarding the measured <br />pore pressures and stability of the gob pile. However, the increases in the pore pressures have <br />been small and HBET does not believe that the pore pressure changes in VWP -A Shallow are an <br />indication of instability in CWDA No. 3. <br />VWP -B Deep <br />VWP -B Deep was installed on October 6, 2014 in the west - central portion of CWDA No. 3. <br />VWP -B Deep was installed in the foundation soil approximately ten feet below the bottom of the <br />gob. Since installation, the pore pressures recorded at VWP -B Deep have been fairly constant. <br />Due to the limited time since installation, it is difficult to make any meaningful determinations <br />regarding the measured pore pressures and stability of the gob pile. However, due to the fairly <br />constant nature of the readings, HBET does not have any concern regarding the measured pore <br />pressures and stability of the gob pile. <br />VWP -B Shallow <br />VWP -B Shallow was installed on October 6, 2014 in the west - central portion of CWDA No. 3. <br />VWP -B Shallow was installed approximately ten feet above the base of the gob. Since <br />installation, the pore pressures recorded at VWP -B Shallow have decreased slightly, increased <br />slightly, and then decreases slightly again. Due to the limited time since installation, it is <br />difficult to make any meaningful determinations regarding the measured pore pressures and <br />stability of the gob pile. However, the changes in pore pressure have been fairly small and HBET <br />does not believe that these changes are of sufficient magnitude to cause any concern regarding <br />the stability of the gob pile. <br />VWP -D <br />VWP -D was installed on October 7, 2014 in the east - central portion of CWDA No. 3. VWP -D <br />was installed approximately ten feet above the base of the gob. Since installation, the pore <br />pressures recorded at VWP -D increased through December 2014. However, the pore pressures <br />have decrease since then. Due to the limited time since installation, it is difficult to make any <br />meaningful determinations regarding the measured pore pressures and stability of the gob pile. <br />However, the changes in pore pressure have been fairly small and HBET does not believe that <br />these changes are of sufficient magnitude to cause any concern regarding the stability of the gob <br />pile. <br />X:\2008 ALL PROJECTS \01349 -Bowie Resources, LLC \01349 -0001 Bowie Mine\200 - Geo \Gob 3\Imtr ntation Monitoring\2015 \01349 -0001 LR042015. doe 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.