Laserfiche WebLink
Julia Keedy <br />Bromley Lakes SWSP <br />April 8, 2015 <br />Page 7 <br />Based upon the above HCU analyses, RMCC's 6-Fulton Ditch shares will yield 24.9 <br />acre -feet in 2015 as summarized below: <br />RMCC's 16 Fulton Ditch shares depletions (acre -feet) <br />*The April through October factors are applied to the 'monthly farm headgate deliveries and <br />the November through March factors are applied to thle prior year annual farm headgate <br />deliveries <br />The SEO has accepted both HCU analyses based on previous change case and based on <br />previous HCU from MEtG gravel pit. However the Applicant is hereby notified that this is the <br />last year these analyses are accepted. Any future SI �VSP requests must provide additional <br />information about the use of the Fulton Ditch shares on the two farms, including <br />justification for any years of non -use, and a detailed site specific historical use analysis. <br />The City of Brighton will measure and deliver <br />directly to the river (via Brighton's Fulton Ditch augr <br />Kenneth Mitchell Lake, Erger Pond, or 124th Storage I <br />deliveries of its shares to the river or storage via the <br />the delivery of any shares to storage and also measui <br />Platte River. The City of Brighton will measure and i <br />supplies leased to RMCC. <br />ie 16 shares of Fulton Ditch water <br />!ntation stations) or to storage at <br />nd. RMCC will measure and report any <br />rger Fulton Lateral. RMCC will measure <br />any release from storage to the South <br />port delivery of all augmentation <br />The balance of the replacement requirements Hof 103.4 acre -feet will be provided by a <br />lease for augmentation credits with the City of Brighton ( "Brighton "). Table 1C, Column 29 <br />shows the distribution of their respective credits. A dopy of the lease with Brighton was <br />provided to this office with this SWSP request and is attached to this letter. <br />The monthly evaporative depletions and prop( <br />can be found on the attached Table 1 C. <br />Conditions of Approval <br />I hereby approve the proposed substitute wa <br />§37 -90- 137(11), subject to the following conditions: <br />monthly replacement requirements <br />supply plan in accordance with C.R.S. <br />Month <br />Jan <br />Feb <br />Mar <br />Apr <br />May <br />June <br />July <br />Aug <br />Sep <br />Oct <br />Nov <br />Dec <br />Total <br />Five shares <br />-0.54 <br />-0.45 <br />-0.33 <br />0.15 <br />1.10 <br />1.83 <br />2.34 <br />1.91 <br />0.87 <br />0.00 <br />-0.58 <br />-0.59 <br />5.71 <br />from Arends <br />Fram <br />Eleven <br />-0.3 <br />-0.3 <br />-0.2 <br />0.6 <br />2.7 <br />4.3 <br />5.4 <br />4.4 <br />2.6 <br />0.8 <br />-0.6 <br />-0.4 <br />19.2 <br />shares from <br />Tower Farm <br />16 Shares <br />-0.9 <br />-0.7 <br />-0.6 <br />0.7 <br />3.8 <br />6.2 <br />7.8 <br />6.3 <br />3.5 <br />0.8 <br />1.1 <br />1.0 <br />24.9 <br />Return Flow <br />1.8% <br />1.5% <br />1.2% <br />58% <br />34% <br />30% <br />30% <br />34% <br />44% <br />71% <br />2.5% <br />2.1% <br />Factors' <br />*The April through October factors are applied to the 'monthly farm headgate deliveries and <br />the November through March factors are applied to thle prior year annual farm headgate <br />deliveries <br />The SEO has accepted both HCU analyses based on previous change case and based on <br />previous HCU from MEtG gravel pit. However the Applicant is hereby notified that this is the <br />last year these analyses are accepted. Any future SI �VSP requests must provide additional <br />information about the use of the Fulton Ditch shares on the two farms, including <br />justification for any years of non -use, and a detailed site specific historical use analysis. <br />The City of Brighton will measure and deliver <br />directly to the river (via Brighton's Fulton Ditch augr <br />Kenneth Mitchell Lake, Erger Pond, or 124th Storage I <br />deliveries of its shares to the river or storage via the <br />the delivery of any shares to storage and also measui <br />Platte River. The City of Brighton will measure and i <br />supplies leased to RMCC. <br />ie 16 shares of Fulton Ditch water <br />!ntation stations) or to storage at <br />nd. RMCC will measure and report any <br />rger Fulton Lateral. RMCC will measure <br />any release from storage to the South <br />port delivery of all augmentation <br />The balance of the replacement requirements Hof 103.4 acre -feet will be provided by a <br />lease for augmentation credits with the City of Brighton ( "Brighton "). Table 1C, Column 29 <br />shows the distribution of their respective credits. A dopy of the lease with Brighton was <br />provided to this office with this SWSP request and is attached to this letter. <br />The monthly evaporative depletions and prop( <br />can be found on the attached Table 1 C. <br />Conditions of Approval <br />I hereby approve the proposed substitute wa <br />§37 -90- 137(11), subject to the following conditions: <br />monthly replacement requirements <br />supply plan in accordance with C.R.S. <br />