My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-22_HYDROLOGY - M1987049
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1987049
>
2015-04-22_HYDROLOGY - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:31 PM
Creation date
4/22/2015 2:15:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
HYDROLOGY
Doc Date
4/22/2015
Doc Name
Substitute Water Supply Plan
From
DNR Water Resources
To
DRMS
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1C <br />Ready Mixed Concrete Company - Bromley Lakes Site <br />Depletions and. Replacements (January - December 2015) <br />Proposed SWSP Operations <br />(all values in acre -feet unless specified) <br />Month <br />Number Out -of- <br />of Days Priority <br />Out -of- Depletion <br />Priority <br />19 20 <br />Total Fulton Replacement <br />Fulton Return Flow CU Credit <br />Share Replacement from Fulton <br />Deliveries Requirement Ditch <br />21 22 23 <br />Total <br />Replacement <br />Requirement <br />24 <br />Fulton <br />Direct <br />To River <br />25 <br />Required Actual <br />Aug Release Aug Release <br />From Storage From Storage <br />To River To River <br />26 27 <br />Surplus <br />Fulton <br />Water to <br />Storage <br />28 <br />Brighton <br />Lease <br />Replacement <br />29 <br />RMCC's <br />EOM <br />Storage <br />30 <br />ERequirement <br />Jan 2015 <br />31 5.5 <br />0 0.9 -0.9 <br />6.3 <br />0 <br />0 0 <br />0 <br />6.3 <br />0 <br />0 <br />Feb <br />28 18.0 <br />0 0.7 -0.7 <br />18.7 <br />0 <br />0 0 <br />0 <br />18.7 <br />0 <br />0 <br />Mar <br />31 10.4 <br />0 0.6 -0.6 <br />11.0 <br />0 <br />0 0 <br />0 <br />11.0 <br />0 <br />0 <br />Apr <br />30 9.8 <br />1.7 1.0 0.7 <br />10.8 <br />1.7 <br />0 0 <br />0 <br />9.1 <br />0 <br />0 <br />May <br />31 10.2 <br />5.8 2.0 3.8 <br />12.2 <br />5.8 <br />0 0 <br />0 <br />6.4 <br />0 <br />0 <br />Jun <br />30 11.8 <br />8.9 2.7 6.2 <br />14.5 <br />8.9 <br />0 0 <br />0 <br />5.6 <br />0 <br />0 <br />Jul <br />31 13.6 <br />11.1 3.3 7.8 <br />16.9 <br />11.1 <br />0 0 <br />0 <br />5.8 <br />0 <br />0 <br />Aug <br />31 13.4 <br />9.6 3.3 6.3 <br />16.7 <br />9.6 <br />0 0 <br />0 <br />7.1 <br />0 <br />0 <br />Sep <br />30 11.9 <br />6.2 2.7 3.5 <br />14.7 <br />6.2 <br />0 0 <br />0 <br />8.5 <br />0 <br />0 <br />Oct <br />31 10.1 <br />2.9 2.0 0.8 <br />12.1 <br />2.9 <br />0 0 <br />0 <br />9.3 <br />0 <br />0 <br />Nov <br />30 7.5 <br />0 1.1 -1.1 <br />8.7 <br />0 <br />0 0 <br />0 <br />8.7 <br />0 <br />0 <br />Dec 2015 <br />31 6.0 <br />0 1.0 -1.0 <br />6.9 <br />0 <br />0 0 <br />0 <br />6.9 <br />0 <br />0 <br />Total <br />1 365 128.3 <br />46.0 21.2 24.9 <br />1 149.5 <br />46.0 <br />0 0 <br />0 <br />103.4 <br />- <br />I - <br />[19] Number of days there was a call on the South Platte River. Conservatively projected to have a call for the entire SWSP period. <br />[20] Out -of -priority depletion equals the fraction of the total net depletion that occurred when there was a call on the South Platte River, equal to [ 18] * [ 19] / # of days in month. <br />[21] RMCC's total Fulton Ditch share deliveries to the river at Brighton's Midland or 124th Ave augmentation' stations and to storage at Brighton's 124th Storage Pond, Kenneth Mitchell Lake, or Erger's <br />Pond, as reported by Brighton. <br />[22] Total Fulton Ditch return flow replacement requirement is equal to the total Fulton Share Deliveries, multiplied by the return flow factors presented in Table 3C, for days when there was a <br />downstream river call. ` <br />[23] Fulton Ditch replacement consumptive use (CU) credit from RMCC's undedicated 16 shares, equal to [21] - [22]. <br />[24] Total replacement requirement is the total of the out -of -priority depletion and the Fulton Ditch return flow obligation, equal to [20] + [22]. <br />[25] Fulton Ditch water delivered directly to the river. <br />[26] Required release of stored Fulton Ditch credits to the South Platte River in order to replace the given month's depletions (or any remaining replacement requirement from the prior month, equal to <br />[24] - [25] + [31] if there is water in storage, Col [30]. <br />[27] Stored Fulton Ditch credits released to South Platte River in order to replace depletions. <br />[28] Surplus Fulton water available for delivery to storage based on Fulton Ditch deliveries, [21 ], in excess of the total replacement requirement, [24]. <br />[29] City of Brighton lease water delivered to the river, as reported by Brighton. Limited to 250 ac -ft per year. <br />[30] RMCC's storage in Brighton's Kenneth Mitchell Lake, Erger's Pond and/or 124th Storage Pond. Equal to previous month's storage minus estimated evaporation and augmentation releases plus <br />surplus Fulton credits delivered to storage (see Table 2). <br />[31] Remaining operations replacement requirement equals previous [31 ] + [24] - [25] - [27] - [29], if positive, otherwise equal to zero. <br />BA <br />�u <br />a BISHOP- BROODEN ASSOCIATES, INC. 7/172015 8.43AM JAK <br />
The URL can be used to link to this page
Your browser does not support the video tag.