My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-22_HYDROLOGY - M1987049
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1987049
>
2015-04-22_HYDROLOGY - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:31 PM
Creation date
4/22/2015 2:15:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
HYDROLOGY
Doc Date
4/22/2015
Doc Name
Substitute Water Supply Plan
From
DNR Water Resources
To
DRMS
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3B <br />Ready Mixed Concrete Company - Bromley Lakes Site <br />2015 SWSP Request <br />Revised Fulton Ditch Yield Analysis - Tower Farm <br />(values in acre -feet unless otherwise indicated) <br />[11] MnG Pit SWSP average historical river diversion for 50 Fulton Ditch shares (provided in Table 6 of the February 18, <br />2013 SWSP Request letter). <br />[12] MnG SWSP Fulton Ditch Consumptive Use Factors as a percentage of Lateral Deliveries (provided in Table 15 of <br />the February 18, 2013 SWSP Request letter). <br />[13] MnG SWSP Fulton Ditch Wintertime Return Flow Replacement Factors as a percentage of Lateral Deliveries <br />(provided in February 16, 2015 email from Rick Parsons to Ioana Comaniciu). <br />[14] Equal to [11] / 50 shares <br />[15] Equal to [14] x 80% Fulton Ditch conveyance efficiency (per the February 18, 2013 SWSP letter). <br />[16] Equal to [15] x (1 - [12]) for April thru October and the annual total of [15] x [13] for November thru March. <br />[17] Equal to [15] - [16] <br />�P►� BBA <br />wntcrcansultants BISHOP- BPOGDEN ASSOCIATES, INC. <br />2/17/2015 8:43 AM JAK <br />MnG Pit SWSP 50 Shares <br />RMCC's 11 Tower Shares <br />CU <br />Replacement <br />Historical <br />% of Farm <br />% of Farm <br />Historical <br />Farm <br />Net <br />River <br />Headgate <br />Headgate <br />River <br />Headgate <br />Return <br />Stream <br />Month <br />Diversion <br />Delivery <br />Delivery <br />Diversion <br />Delivery <br />Flows <br />Depletion <br />11 <br />12 <br />13 <br />141 <br />15 <br />16 <br />17 <br />January <br />0.0 <br />- <br />1.0% <br />0.0 <br />0.0 <br />0.3 <br />-0.3 <br />February <br />0.0 <br />- <br />0.8% <br />0.0 <br />0.0 <br />0.3 <br />-0.3 <br />March <br />0.1 <br />- <br />0.7% <br />0.0 <br />0.0 <br />0.2 <br />-0.2 <br />April <br />5.6 <br />55.9% <br />- <br />1.2 <br />1.0 <br />0.4 <br />0.6 <br />May <br />21.9 <br />69.7% <br />- <br />4.8 <br />3.9 <br />1.2 <br />2.7 <br />June <br />34.5 <br />71.5% <br />- <br />7.6 <br />6.1 <br />1.7 <br />4.3 <br />July <br />43.2 <br />71.6% <br />- <br />9.5 <br />7.6 <br />2.2 <br />5.4 <br />August <br />37.2 <br />67.5% <br />- <br />8.2 <br />6.5 <br />2.1 <br />4.4 <br />September <br />24.8 <br />59.8% <br />- <br />5.5 <br />4.4 <br />1.8 <br />2.6 <br />October <br />11.6 <br />41.5% <br />- <br />2.6 <br />2.0 <br />1.2 <br />0.8 <br />November <br />0.3 <br />- <br />1.8% <br />0.0 <br />0.0 <br />0.6 <br />-0.6 <br />December <br />0.0 <br />1 <br />- <br />1.2% <br />0.0 <br />0.0 <br />0.4 <br />-0.4 <br />Annual <br />179.2 <br />- <br />- <br />39.3 <br />31.5 <br />12.3 <br />19.2 <br />[11] MnG Pit SWSP average historical river diversion for 50 Fulton Ditch shares (provided in Table 6 of the February 18, <br />2013 SWSP Request letter). <br />[12] MnG SWSP Fulton Ditch Consumptive Use Factors as a percentage of Lateral Deliveries (provided in Table 15 of <br />the February 18, 2013 SWSP Request letter). <br />[13] MnG SWSP Fulton Ditch Wintertime Return Flow Replacement Factors as a percentage of Lateral Deliveries <br />(provided in February 16, 2015 email from Rick Parsons to Ioana Comaniciu). <br />[14] Equal to [11] / 50 shares <br />[15] Equal to [14] x 80% Fulton Ditch conveyance efficiency (per the February 18, 2013 SWSP letter). <br />[16] Equal to [15] x (1 - [12]) for April thru October and the annual total of [15] x [13] for November thru March. <br />[17] Equal to [15] - [16] <br />�P►� BBA <br />wntcrcansultants BISHOP- BPOGDEN ASSOCIATES, INC. <br />2/17/2015 8:43 AM JAK <br />
The URL can be used to link to this page
Your browser does not support the video tag.