My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-20_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-04-20_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:26 PM
Creation date
4/21/2015 8:49:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/20/2015
Doc Name
Weekly CQA Report Weeks Ending 4/4/15 & 4/11/15
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) <br />SQUAW GULCH (VLF) WEEKLY REPORT <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: April 4, 2015 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 3.29.2015 through 4.4.2015 <br />Days <br />S <br />I M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D =Day Shift N =Night Shift W= Weather <br />Ambient Temperature Ranges During Week I Weather Conditions During Week: <br />Highs: 31 OF to 59 °F <br />Lows: 28 °F to 35 °F <br />Cloud Cover: Clear to cloudy <br />Precipitation: Snow 4/3/15 (-1 ") <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Structural Fill: <br />amec <br />foster <br />wheeler <br />An Amec Foster Wheeler field professional monitored fill material temperatures during fill <br />placement; average structural fill temperatures were above 32 °F. Snow was removed from areas <br />prior to fill placement. All construction materials placed were verified as suitable, and <br />construction methods were in accordance with project technical specifications. <br />The majority of the week's Structural Fill (SF) activity occurred in Phase 2 above the ADR2 haul <br />road and below the Surface Water Diversion Channel in the vicinity of access road stationing <br />75 +00 through 85 +00 and S40 +00 through S50 +00. The majority of the SF placement came from <br />local cuts to fills with a portion being hauled and placed from the Dump 4 borrow area. <br />SF cut to fill activity occurred to a lesser degree in the Squaw Gulch area between the ADR2 haul <br />road and the H bench and between the I and K benches in the vicinity of stations 18 +00 through <br />110 +00 and K0 +00 through K4 +00. <br />Multiple Cat dozers (DUs, D8's, and D10's) and Cat compactors cut/filled and compacted the SF <br />material. Oversized SF material, when encountered, was broken up using Cat excavators with <br />attached rock hammers. <br />The Structural Fill material was placed and compacted per the project plans and specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.