Laserfiche WebLink
NE rangeland area = 0.97 ac <br />SE rangeland area = 1.06 ac <br />Total: 16.42 ac <br />Using 6 inches thickness, this is an amount of 13,245 cy. Since there is 3045 cy available from the <br />Atlas pile footprint, the amount of imported soil needed is 10,200 cy. <br />This area of 16.42 acres is also the area for site seeding and mulching. <br />Since the reclamation plan does not call for the removal of all surface facilities, and the Atlas <br />waste area will not have been developed yet, related reclamation will not be necessary. A detailed <br />breakdown of each task and its associated cost is shown in Table L -1. <br />Details of main building construction details built as of September 2013 are shown below: <br />• Dry Room Building <br />• 47' wide x 50' long x 28' tall "at peak" <br />• Monolithic slab w/ pre footer. Grade Beam: 16" wide x 18" deep, Slab is 6" thick <br />• RCM50 Rustable metal siding and roofing <br />• In -Floor Radiant and Baseboard heating <br />• Spray Foam Insulation <br />• Propane Boiler Heat <br />• The Dry room and office has showers, lockers, toilets, sinks, offices on the second <br />19 IWOOM <br />• Filter Building <br />o 56' wide x 92' long x 35' tall "at peak" <br />o Rat slab to bedrock, Micropyles under columns, Footers, 12' Walls and Slab <br />Revenue Mine March 2015 L -4 <br />