Laserfiche WebLink
Mr. Sprague <br />Page 5 <br />April 17, 2015 <br />b. A description of the various control methods which will l be employed, such as <br />mechanical, chemical, or biological controls. <br />c. A monitoring plan which specifies the frequency and timing of monitoring for <br />noxious weed species and what actions will be taken when noxious weeds are <br />identified. <br />d. A post- treatment plan to determine effectiveness of control measures. <br />e. A commitment from the Operator to follow the approved weed control plan for the <br />life of the mine. <br />6.4.6 Exhibit F — Reclamation Plan Map <br />28. The Division requests a copy of Exhibit F.1: Reclamation Plan Map without the permit <br />boundaries associated with the former Masonville Div operation (M- 1985 -099). <br />29. As required by Rule 6.4.6(a), the Reclamation Plan Map must! show the proposed topography <br />with contour lines of sufficient detail to portray the direction and rate of slope of all <br />reclaimed lands. The Reclamation Plan Map which was submitted appears to show the <br />existing contours of the site. Please revise the Reclamation Plan Map accordingly. <br />6.4.7 Exhibit G — Water Information <br />30. The Application included a copy of a stormwater discharge permit. Please specify if this <br />permit has been obtained and commit to providing the Division with a copy of the permit <br />when it is obtained. <br />31. As required by Rule 6.4.7(2), all tributary water courses, wells, springs, and ditches on the <br />affected land and on adjacent lands where such structures may be affected by the proposed <br />mining operation shall be identified on Exhibit C. Please revise the Mining Plan Map <br />accordingly. <br />32. The stormwater management plan states additional controls include proposed entrance <br />stabilization and stabilization of the material handling area. Please describe the measures to <br />be taken to stabilize these areas in order to control stormwater runoff. <br />33. As required b Rule 6.4.7(3), rovide an estimate of the proj i ct water requirements for the <br />q Y p <br />operation, including for dust control. In addition, specify the source of the water. <br />34. The stormwater management plan states that stormwater will report to roadside ditches along <br />County Road 27 and County Road 32C. Please describe where water on the west side of the <br />ridge will report to. I <br />