Laserfiche WebLink
The following are the estimated reclamation costs for phase one mining operations at the <br />Schosser Pit I: <br />Overburden Backfill <br />The overburden backfill will be done using a scraper. The average haul distance will be <br />750 feet. There will be a total of 32,000 cubic yards of overburden stockpiled at the end of <br />mining in the phase one area. <br />32,000 cubic yards @ $0.90 (rate for average haul of 750 feet with scraper) = $28,800.00. <br />Gradin <br />The grading will be done using a dozer and /or a motor grader. The rate for this reclamation <br />will be considered using only the motor grader due to the flattened terrain. All 20 acres of the <br />phase one area will be graded. <br />20 acres @ $75.25 /Acre (motor grader rate per acre) = $1,500.00. <br />t <br />Topsoil Redistribution <br />The topsoil redistribution will be done using a scraper. The rate for this replacement with an <br />average haul distance of 750 feet is $0.90 per cubic yard. <br />45,000 cubic yards @ $0.90 /cubic yard = $40,500.00. <br />L -3 <br />