Laserfiche WebLink
COMPACTION WORK <br />Task description: Compact Backfilled and Regraded Surfaces <br />Site: Fruita Loadout Permit Action: MT1 i Permit/Job #: C2010088 <br />PROJECT IDENTIFICATION <br />Task #: 015 State <br />Date: 8/26/2014 County <br />User: ZTT <br />Colorado <br />Mesa <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: C088 -015 <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 815F Horsepower: 240 <br />Compactor Type: Soil - tamping foot ' Shift Basis: 1 per day <br />Total Fleet Cost/Hour: $151.63 ' <br />i <br />MATERIAL QUANTITIES j <br />Loose volume: 75,100 LCY I Shrinkage factor: 0.875 <br />Compacted volume: 65,713 CCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Unadjusted hourly production = (W x S x L x Q/ P <br />Data Source: (CRG) <br />Cost Breakdown: <br />Average Compactor Speed (S): <br />4.00 mph <br />Compacted thickness of each lift (L): <br />10.00 inches <br />Utilization % <br />Ownership Cost/Hour: <br />$36.81 <br />NA <br />Operating Cost/Hour: <br />$81.79 <br />100 <br />Operator Cost/Hour: <br />$33.03 <br />NA <br />Total Unit Cost/Hour: <br />$151.63 <br />Total Fleet Cost/Hour: $151.63 ' <br />i <br />MATERIAL QUANTITIES j <br />Loose volume: 75,100 LCY I Shrinkage factor: 0.875 <br />Compacted volume: 65,713 CCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Unadjusted hourly production = (W x S x L x Q/ P <br />Compacted width per pass (W): <br />6.50 feet <br />Average Compactor Speed (S): <br />4.00 mph <br />Compacted thickness of each lift (L): <br />10.00 inches <br />Conversion Constant (C): <br />16.3 1 (5,280ft. /12in. /27cu.ft.) <br />Required number of machine passes (P): <br />4 passes <br />Unadjusted Hourly Unit Production: <br />1,059.50 CCY/hour <br />Job Condition Correction Factors <br />Site Altitude: 4,500 feet <br />Source <br />Altitude Adj: 1.00 <br />CAT HB <br />Job Efficiency: 0.83 <br />1 shift/day) <br />Net Correction: 0.8300 <br />multiplier <br />' <br />Adjusted Hourly Unit Production: <br />879.39 CCY/Hour <br />Adjusted Hourly Fleet Production: <br />879.39 CCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Compactor(s) <br />Total job time: 74.73 Hours <br />Unit cost: $0.172 per CCY <br />Total job cost: $11,331 <br />CIRCES Cost Estimating Software <br />